TSI Instruments ProCage BATTING TUNNEL FRAME KIT Скачать руководство пользователя страница 6

STEP 

5

:  

NET INSTALLATION

1.

Stretch out batting tunnel net on ground inside frame.

2. Locate top net corners. Starting at one end, clip the net corners and center rope to cable using the snap links provided. Use 14 snap links per cable

length. Snap links should be spaced approximately 5 feet apart for a 70' net and 4 feet apart for a 55' net.
3. Use winch to lift net into place. DO NOT OVERTIGHTEN CABLE!
4. Secure each corner and center rope of tunnel net to each corner and center point of the frame.

NOTES: THE WINCH SHOULD BE SECURED BY PLACING A LOCK THROUGH ONE OF THE HOLES IN THE SIDE OF THE DRUM.  THIS WILL 

HELP PREVENT VANDALISM OR ACCIDENTAL FREE SPOOLING. 

*

MANUFACTURERS STRONGLY RECOMMEND THAT NET IS REMOVED FROM FRAME WHEN NOT USED FOR EXTENDED PERIODS OF

TIME, BEFORE HIGH WINDS, ICE OR SNOW STORMS.

*

BATTING TUNNEL FRAME IS NOT DESIGNED TO  HOLD HEAVY SNOW OR ICE LOADS.

Note: Purchaser 

 

must be responsible for compliance with any local or state building codes pertaining to this product. 

Manufacturer, distributor, or any of their representatives will assume no liability for code compliance. 

Copyright 2015 

Trigon Sports International, Inc

Page 6

Содержание ProCage BATTING TUNNEL FRAME KIT

Страница 1: ...ection F Ground Sleeve 30 2 Frame Section L 5 16 x 3 Hex Bolt 24 Total M 5 16 Lock Washer 36 Total N 5 16 Lock Nut 36 Total 5 16 x 4 Eyebolt 7 Total Pulley Eyebolt Assembly 5 Total Spring Hooks 42 Total 1 8 Steel Cable 285 Total 1 8 Wire Rope Clamp 1 Total Manual Winch 1 Total NOTE Purchaser must be responsible for compliance with any local or state building codes pertaining to this product Manufa...

Страница 2: ... in diameter This will mount the ground sleeves Part F flush with the ground End poles should be installed to lean slightly outward where the top of the frame is approximately 4 out of plumb 4 Pour concrete into each hole around the ground sleeve Re check measurements One 80 pound bag of concrete for each hole should be sufficient Allow concrete to set for 24 hours before proceeding to cable assem...

Страница 3: ...Part B Connect with 5 16 x 3 bolt See Diagram 1 and Detail 1 This creates the right side upright Be sure to align bolt hole locations of uprights so that holes are facing the length of the frame Install upright into ground sleeve Part F Baby powder can be used to assist in sliding upright into sleeve 4 Slide Parts D and E together ensuring the holes on the outside reduced ends face the same direct...

Страница 4: ... Tunnel J Eyebolt Location for 12 Tunnel K Center Eyebolt Location Diagram 2 Manual Winch HE Eyebolt only Horizontal to ground VE Eyebolt only Vertical to ground HP Eyebolt w Pulley Horizontal to ground VP Eyebolt w Pulley Vertical top ground HE VE HP VE HP VP HP HP VE HP VE HP H Holes for Member connection I Eyebolt Location for 14 Tunnel J Eyebolt Location for 12 Tunnel Copyright 2015 Trigon Spo...

Страница 5: ...ion per Diagram 2 4 For the cable finish position thread the cable through the pulley above the winch Extend cable down to winch Follow instructions on winch to attach cable 5 Rotate winch until all cable is raised approximately 4 feet from the ground Proceed to net installation G Holes for Winch Attachment H Holes for Member connection I Eyebolt Location for 14 Tunnel J Eyebolt Location for 12 Tu...

Страница 6: ...ter point of the frame NOTES THE WINCH SHOULD BE SECURED BY PLACING A LOCK THROUGH ONE OF THE HOLES IN THE SIDE OF THE DRUM THIS WILL HELP PREVENT VANDALISM OR ACCIDENTAL FREE SPOOLING MANUFACTURERS STRONGLY RECOMMEND THAT NET IS REMOVED FROM FRAME WHEN NOT USED FOR EXTENDED PERIODS OF TIME BEFORE HIGH WINDS ICE OR SNOW STORMS BATTING TUNNEL FRAME IS NOT DESIGNED TO HOLD HEAVY SNOW OR ICE LOADS No...

Отзывы: