![TSI Instruments ProCage BATTING TUNNEL FRAME KIT Скачать руководство пользователя страница 1](http://html1.mh-extra.com/html/tsi-instruments/procage-batting-tunnel-frame-kit/procage-batting-tunnel-frame-kit_assembly-instructions-manual_1178274001.webp)
Trigon Sports International
488 Cumberland Avenue
Memphis, T
N
38112
Phone:
(
888
)
313-1303
ProCage
™
B
ATTING
TUNNEL
FRAME KIT
A
ssembly Instructions
ITEM
DESCRIPTION
QTY
A
Upright A, 76 3/4" (4 holes) 1 / Frame Section
B
Upright B, 76 3/4" (2 holes) 3 / Frame Section
C
Elbow, 16 1/2" (4 holes)
2 / Frame Section
D
Cross Member, 86"
1 / Frame Section
E
Cross Member, 86"
1 / Frame Section
F
Ground Sleeve, 30"
2 / Frame Section
L
5/16" x 3" Hex Bolt
24 Total
M
5/16" Lock Washer
36 Total
N
5/16" Lock Nut
36 Total
5/16" x 4" Eyebolt
7 Total
Pulley / Eyebolt Assembly 5 Total
Spring Hooks
42 Total
1/8" Steel Cable
285' Total
1/8" Wire Rope Clamp
1 Total
Manual Winch
1 Total
N
OTE
: Purchaser
must be responsible for compliance with
any local or state building codes pertaining to this product.
Manufacturer, distributor, or any of their representatives will
assume no liability for code compliance.
Copyright 2015
Trigon Sports International, Inc
Page 1