TS 120A 26KVA Max Скачать руководство пользователя страница 3

3.

             INSTALLATION INSTRUCTIONS

1. Mark positions where you will like to install

 

the device 

    

and mount a meter board on that position and screw the

    Smart Changeover on the meter board.

GEN

NB: 

Connect wires from the terminal labeled GEN start and
GEN Shutdown in the device to the switch of the gene-
rator start and shutdown respectively.

NEPA

OUTPUT

GEN

Start

GEN

Shutdown

2. Connect the wiring of the home to the device as illust

-

    

rated below

GEN Start and Shutdown wire from the GEN should 
be connected through a socket and 13A plug so that
the GEN can easily be moved conveniently in the 
event of maintenance.
       