
3.
INSTALLATION INSTRUCTIONS
1. Mark positions where you will like to install
the device
and mount a meter board on that position and screw the
Smart Changeover on the meter board.
GEN
NB:
Connect wires from the terminal labeled GEN start and
GEN Shutdown in the device to the switch of the gene-
rator start and shutdown respectively.
NEPA
OUTPUT
GEN
Start
GEN
Shutdown
2. Connect the wiring of the home to the device as illust
-
rated below
GEN Start and Shutdown wire from the GEN should
be connected through a socket and 13A plug so that
the GEN can easily be moved conveniently in the
event of maintenance.
2