background image

21 South Field Drive, Elmira, Ontario, N3B 0A6 - Tel: (519)-669-5421 - Fax: (519)-669-8912 

Website: www.trylon.com 

SuperTitan Manual Update:

Dear Customer; 

Thank you for purchasing one of our SuperTitan Towers! Welcome to the Trylon family, 

we hope that you enjoy your tower purchase and that this tower meets your expectations 

of  a  high  quality  product.  Ensuring  quality  in  our  products  is  something  that  Trylon 

always strive to achieve and we believe that it shows.

One of the ways we want to help you the customer is to indicate some updates to our 

product that are not yet shown in our manual. Please review the below update notes: 

1)

FOR  PAGES  28-41(Dwg#1.620.014-1.620.0029):  Sections  2F-

13FHD will now have an additional hole on both sides of the angle at 

the bottom of the leg. This additional hole has been added to facilitate 

Trylon’s  NEW  SuperTitan  Packaging  method.  The  addition  of  these 

two holes does not in any way affect the structural integrity of the leg.

2)

FOR PAGES 17-25(Dwg#1.620.0058-1.620.0066): For Sections #13-

21, all diagonal members now have two bolt holes at either end of the 

member. This change has been made to allow for easier installation. 

The  addition  of  the  second  hole  does  not  affect  the  diagonal’s 

structural integrity.

If you ever have a question regarding the above or your tower in general please feel free 

to  call  our  office  at  (519)  669-5421  or  email  [email protected]  and  ask  for  a 

representative from the Stock Products Team. We will gladly answer any questions you 

may have.  

Thanks for taking the time to review and we hope you enjoy your tower. 

Sincerely

The Stock Products Team 

Trylon TSF 

Содержание SuperTitan

Страница 1: ...LITERATURE PART 5 95 0000 000 Revision date April 20h06 include with all SuperTitan Towers INSTALLATION MANUAL November 2011 August 2014...

Страница 2: ...nd strength in transport and will protect against the potential for a loss of section parts hardware During testing the new self contained packaging vastly outperformed the existing wood crate This im...

Страница 3: ...tan Unpacking Manual Step 1 Place SuperTitan section on flat sturdy surface Check section for any signs of damage Step 2 Disassemble the bolt connection that is connecting the end cap to the top secti...

Страница 4: ...Step 3 Remove Leg exposing the section s hardware on the inside Step 4 Carefully remove the section s hardware taking care to ensure all parts are accounted for...

Страница 5: ...Step 5 Disassemble the remaining bolt connections and separate the section legs from the end cap Step 6 Review SuperTitan Installation Manual Part Number 5 95 0000 000...

Страница 6: ...Step 7 Recycle End Cap and Bolt Assemblies...

Страница 7: ...onal hole on both sides of the angle at the bottom of the leg This additional hole has been added to facilitate Trylon s NEW SuperTitan Packaging method The addition of these two holes does not in any...

Страница 8: ...et 2 Section Assembly Drawings Section 1 21 3 25 Top Section Angle Frames Top Mount Pipe Kits 26 27 Short Foundation Sections 1 12HD 28 41 Base Feet Template Sections 1 12HD 42 Base Feet Template Draw...

Страница 9: ...Pg 1...

Страница 10: ......

Страница 11: ...Instructions for Tightening of SuperTITAN A325 Grade Bolts Using Turn of the Nut Method...

Страница 12: ...Pg 3...

Страница 13: ...Pg 4...

Страница 14: ...Pg 5...

Страница 15: ...Pg 6...

Страница 16: ...Pg 7...

Страница 17: ...Pg 8...

Страница 18: ...Pg 9...

Страница 19: ...Pg 10...

Страница 20: ...Pg 11...

Страница 21: ...Pg 12...

Страница 22: ...ENG SERVER ammeridian VAULT D DRAWINGS 000001 620 0128 1 dwg 5 25 2007 10 36 03 AM marcush...

Страница 23: ...Pg 13...

Страница 24: ...Pg 14...

Страница 25: ...Pg 15...

Страница 26: ...Pg 16...

Страница 27: ...Pg 17...

Страница 28: ...Pg 18...

Страница 29: ...Pg 19...

Страница 30: ...Pg 20...

Страница 31: ...Pg 21...

Страница 32: ...Pg 22...

Страница 33: ...Pg 23...

Страница 34: ...Pg 24...

Страница 35: ...Pg 25...

Страница 36: ...Pg 26...

Страница 37: ...Pg 27...

Страница 38: ...Pg 28...

Страница 39: ...Pg 29...

Страница 40: ...Pg 30...

Страница 41: ...Pg 31...

Страница 42: ...Pg 32...

Страница 43: ...Pg 33...

Страница 44: ...Pg 34...

Страница 45: ...Pg 35...

Страница 46: ...Pg 36...

Страница 47: ...Pg 37...

Страница 48: ...Pg 38...

Страница 49: ...Pg 39...

Страница 50: ...Pg 40...

Страница 51: ...Pg 41...

Страница 52: ...Pg 42...

Страница 53: ...Pg 43...

Страница 54: ...Pg 44...

Страница 55: ...Pg 45...

Страница 56: ...Pg 46...

Страница 57: ...Pg 47...

Страница 58: ...Pg 48...

Страница 59: ...Pg 49...

Страница 60: ...Pg 50...

Страница 61: ...21 61 Revised April 2006 TABLE OF CONTENTS SUPERTITAN INSTALLATION MANUAL PDF SUPERTITAN Foundation Drawings for NORMAL DRY SOIL EIA Foundation Notes 51 Regular Foundation NDS Section 2 12HD 52 Single...

Страница 62: ...Pg 52 Pg 51...

Страница 63: ...Pg 53 Pg 52...

Страница 64: ...Pg 51 Pg 53...

Страница 65: ...Pg 54...

Страница 66: ...Pg 55...

Страница 67: ...Pg 56...

Страница 68: ...Pg 57...

Страница 69: ...Pg 58...

Страница 70: ...Pg 59...

Страница 71: ...Pg 60...

Страница 72: ...Pg 61...

Страница 73: ...Pg 62...

Страница 74: ...Pg 63...

Страница 75: ...Pg 64...

Страница 76: ...Pg 66...

Страница 77: ...Pg 67...

Страница 78: ...Pg 68...

Страница 79: ...Pg 69...

Страница 80: ...Pg 70...

Страница 81: ...Pg 71...

Страница 82: ...Pg 72...

Страница 83: ...Pg 73...

Страница 84: ...Pg 74...

Страница 85: ...Pg 75...

Страница 86: ...Pg 76...

Страница 87: ...Pg 77...

Страница 88: ...Pg 78...

Страница 89: ...Pg 79...

Страница 90: ...Pg 80...

Страница 91: ......

Страница 92: ...ITAN INSTALLATION MANUAL April 2006 Printed in Canada Copyright Trylon Manufacturing Co 21 SOUTH FIELD DRIVE P O BOX 186 ELMIRA ON N3B 2Z6 CANADA TEL 519 669 5421 FAX 519 669 4187 WEBSITE www trylon c...

Отзывы: