background image

1. Place the concrete base in its intended location. The bottom of the base has adjustable feet to 

accommodate for uneven flooring. Adjust each of the feet by turning them either clockwise or 

counter-clockwise, checking with a level until the base is level both vertically and horizontally. 

That’s it! We hope you enjoy your Casa Table. If you have any 
questions or need assistance, feel free to reach us at 
888-474-7977 or at [email protected].  

If you have purchased a custom-sized CASA, simply follow 
the directions above while using the overhang dimensions 
provided in your technical drawing.   

Setting the Base

2. The underside (subdeck) of the top has been predrilled to 

accept screws. One location will be marked with a colored 
circle that corresponds to a similar mark on one of the 4 
brackets. This is done to ensure the top is orientated 
properly and the holes align with the brackets. Identify 
these marks on both the top and base. 

3. Place the top on the base so that location of the two 

colored dots align while centering it as well as you can by 
eye. Once the top is on, make small adjustments until the 
holes and brackets align by measuring the overhang on all 
sides using values in the charts to the right.

4. Using a power drill with a Phillips-Head bit, drive screws 

through the holes in each of the 4 mounting brackets and 
into the wooden subdeck. You may wish to tighten with a 
Phillips-head screwdriver to avoid stripping the pilot hole. 

Placing the Top

For Custom Sizes

BASE

59” x 59” CASA

48” x 48” CASA

BASE

15”

12”

12”

12”

12”

15”

15”

15”

CASA CONCRETE TABLE

INSTALLATION INSTRUCTIONS

SKU: TBL-CASA  /  59” & 48” SQUARE MODELS  

Отзывы: