background image

Variants for ceiling installation

Dimensions [mm]

L

 

B

L

1

L

2

X

593

×

593

522

444

104

598

×

598

522

444

106.5

618

×

618

522

444

116.5

623

×

623

522

444

119

1193

×

593

1122

1044

104

1198

×

598

1122

1044

106.5

1243

×

618

1147

1069

116.5

1248

×

623

1147

1069

119

L = total length (grille), B = total width (grille)

Variants for freely suspended installation

Dimensions [mm]

L

 

B

L

1

L

2

X

900

×

900

522

444

257.5

1525

×

900

1147

1069

257.5

L = total length (grille), B = total width (grille)

Dimensions [mm]

D

A

H

123

125

230

158

143

245

Weight [kg]

Nominal size [mm]

DID614

Contained water

600 

×

 600

16

2

1200 

×

 600

30

3

1250 

×

 625

31

3

900 

×

 900

21

2

1525 

×

 900

38

3

Technical data

 

Active chilled beams Type DID614

5

Содержание DID614

Страница 1: ...ater connections Encasement optional Heat exchanger Front frame Induced air grille Installation manual en GB Active chilled beams Type DID614 TROX GmbH Heinrich Trox Platz 47504 Neukirchen Vluyn Germa...

Страница 2: ...this manual has been compiled with reference to the applicable standards and guidelines the state of the art and our expertise and experience of many years The manufacturer does not accept any liabil...

Страница 3: ...ct use Incorrect use of the unit can lead to dangerous situations Never use the unit in areas with potentially explosive atmos pheres in humid rooms in rooms with aggressive or dust laden air Importan...

Страница 4: ...ty Up to approx 2000 W Max operating pressure water side 6 bar Max operating temperature 75 C 55 C when using flexible connecting hoses Minimum operating temperature 6 C Dimensions L1 L2 634 595 H L Z...

Страница 5: ...1147 1069 119 L total length grille B total width grille Variants for freely suspended installation Dimensions mm L B L1 L2 X 900 900 522 444 257 5 1525 900 1147 1069 257 5 L total length grille B tot...

Страница 6: ...g 3 Carrying the unit in pairs Use only lifting and transport gear designed for the required load Always secure the load against tip ping and falling Upon delivery carefully remove the packaging and c...

Страница 7: ...593 618 8 Fig 4 Ceiling installation visible T bars DID614 Ceiling tile 598 623 8 Fig 5 Ceiling installation with clamping profile DID614 Ceiling tile 8 598 623 Fig 6 Ceiling installation concealed T...

Страница 8: ...ible remove the adjacent ceiling tiles Only work in pairs preferably use a lift DANGER Danger of death from the fall of suspended loads Only use fixing materials designed for the required load Use all...

Страница 9: ...e hoses accessory G 1 2 union nut and flat seal SW24 Screw connection rigid Flexible hoses accessory Connecting the unit screw connection Personnel Specialist personnel Protective equipment Industrial...

Страница 10: ...and free from residues and foreign matter Ensure that the water system including the heat exchanger has been filled and vented Setting the air control blades The air discharge pattern can be changed...

Страница 11: ...ir grille Fig 11 1 pull it down To completely remove the grille unhook the safety cables Fig 11 2 by pulling them down together with the retaining plates Fig 11 3 Fig 12 Adjusting the nozzles on the D...

Страница 12: ...y shoes Protective gloves 1 Remove the induced air grille on page 11 Fig 13 Cleaning the heat exchanger 2 Carefully clean the heat exchanger with an industrial vacuum cleaner Be careful to not damage...

Отзывы: