Before initial commissioning:
Remove protective film, if any
Check the unit for leakages
Check inspection access doors and openings for
function and tolerance
Adjust the door closure,
Adjust inspection access doors,
Insert the filters,
‘Filters, inserting’ on page 48
Set up the heating coil/cooling coil,
sioning the heating coil/cooling coil’ on page 49
Set up the sound attenuator,
Set up the run around coil system,
sioning the run around coil system’ on page 51
Set up the plate heat exchanger,
plate heat exchanger’ on page 52
Remove the protective caps from the condensate
drains and connect the drain trap,
‘Sizing and connecting the condensate drain’
Clean the air handling unit,
Ä
Operating manual,
Maintenance.
6.3 Setting up and adjusting AHU
casing units
6.3.1 Inspection access doors
The door leaf can be adjusted vertically with the slotted
holes in the hinge block, and horizontally with the
slotted holes in the hinge bracket.
The two-part hinge bracket simplifies mounting and
removing inspection access doors. To remove an
inspection access door, remove the hinge bracket
screws.
Adjusting inspection access doors
Personnel:
HVAC technician
Protective equipment:
Industrial safety helmet
Protective clothing
Protective gloves
Safety shoes
Fig. 39: Adjusting the door
1.
Remove the hinge covers ( Fig. 39 /1).
Adjusting the door horizontally
2.
Loosen the screws of all hinge brackets
3.
Adjust the door horizontally ( Fig. 39 /5).
4.
Tighten the screws of the hinge brackets
Adjusting the door vertically
5.
Loosen the screws of all hinge blocks ( Fig. 39 /3)
on a door.
6.
Adjust the door vertically ( Fig. 39 /4).
7.
Tighten the screws of the hinge blocks
Initial commissioning
Setting up and adjusting AHU casing units > Inspection access doors
Air handling unit X-CUBE Ex
45