Please note:
Installation and connections to be performed
by others; fixing, connection and sealing mate-
rial to be provided by others.
Cooling panels to be installed above an open
cell ceiling should have a free area that is as
large as possible so as not to reduce the
cooling capacity more than necessary.
Provide devices for shut-off and venting.
Fix the product only to load-bearing structural
elements.
Continuous ceilings have to be designed to
carry at least the combined load of the cooling
panels plus accessories and contained water.
Suspensions used for cooling panels (rafts)
have to be designed to carry at least the com-
bined load of the panels plus accessories and
contained water. Choose enough fixing points
to fit the overall dimensions and the total
weight.
The installed cooling panels must be easily
accessible for inspection and cleaning.
Use only certified fixing systems that are suit-
able for carrying the intended load.
Use preferably threaded rods or suitable rail
systems for suspension.
Use all the provided suspension points.
Stand clear of suspended loads, unless prop-
erly secured.
Check secure fixing after installation.
Take heed of any notes regarding the cooling
panels.
The product is intended for use in internal spaces,
preferably with a clear height between 2.60 m and
4.00 m. We strongly recommend combining the
panels with a mechanical ventilation system. Do not
connect the cooling panels to the water system until
the ventilation and air conditioning system has been
installed, and the cleanliness of both the system
and the room has been examined and documented.
Only work in pairs; preferably use a lift.
Installation types
Fig. 2: Freely suspended cooling panel (raft)
1
Ceiling slab or suspended ceiling
2
Cooling panels (rafts)
Freely suspended installation is possible with
all ceiling systems. A continuous airflow also
on the upper surface must be ensured. With
open cell ceilings, the cooling panels have to
be installed above the grid. The free area
should be as large as possible.
Installation
Chilled ceiling WK-D-WF
4