Trox Technik WK-D-WF Скачать руководство пользователя страница 4

Please note:

Installation and connections to be performed
by others; fixing, connection and sealing mate-
rial to be provided by others.

Cooling panels to be installed above an open
cell ceiling should have a free area that is as
large as possible so as not to reduce the
cooling capacity more than necessary.

Provide devices for shut-off and venting.

Fix the product only to load-bearing structural
elements.

Continuous ceilings have to be designed to
carry at least the combined load of the cooling
panels plus accessories and contained water.

Suspensions used for cooling panels (rafts)
have to be designed to carry at least the com-
bined load of the panels plus accessories and
contained water. Choose enough fixing points
to fit the overall dimensions and the total
weight.

The installed cooling panels must be easily
accessible for inspection and cleaning.

Use only certified fixing systems that are suit-
able for carrying the intended load.

Use preferably threaded rods or suitable rail
systems for suspension.

Use all the provided suspension points.

Stand clear of suspended loads, unless prop-
erly secured.

Check secure fixing after installation.

Take heed of any notes regarding the cooling
panels.

The product is intended for use in internal spaces,
preferably with a clear height between 2.60 m and
4.00 m. We strongly recommend combining the
panels with a mechanical ventilation system. Do not
connect the cooling panels to the water system until
the ventilation and air conditioning system has been
installed, and the cleanliness of both the system
and the room has been examined and documented.
Only work in pairs; preferably use a lift.

Installation types

Fig. 2: Freely suspended cooling panel (raft)

1

Ceiling slab or suspended ceiling

2

Cooling panels (rafts)
Freely suspended installation is possible with
all ceiling systems. A continuous airflow also
on the upper surface must be ensured. With
open cell ceilings, the cooling panels have to
be installed above the grid. The free area
should be as large as possible.

Installation

 

Chilled ceiling WK-D-WF

4

Содержание WK-D-WF

Страница 1: ...panels can lead to dangerous situations Do not use cooling panels in areas with potentially explosive atmos pheres outdoors in humid rooms in rooms with aggressive or dust laden air at temperatures b...

Страница 2: ...d Personal protective equipment Personal protective equipment is equipment that protects the user against health or safety risks at work Personal protective equipment must be worn for various types of...

Страница 3: ...e note Store the product only in its original packaging Protect the product from the effects of weather Protect the product from humidity dust and contamination Storage temperature 10 C to 40 C Relati...

Страница 4: ...intended load Use preferably threaded rods or suitable rail systems for suspension Use all the provided suspension points Stand clear of suspended loads unless prop erly secured Check secure fixing af...

Страница 5: ...iling installation in continuous ceilings is possible with or without adjacent gaps The cooling capacity that can be achieved depends on the structure of the ceiling Installation with gaps allows for...

Страница 6: ...DANGER Risk of scalding Working on the hot water system carries a risk of scalding Only specialist personnel should work on the water side connections Before working on the water side connec tions shu...

Страница 7: ...lation and then at regular intervals NOTICE Risk of damage to the copper serpentine due to freezing water If the chilled ceiling is not used after the system has been filled subzero temperatures may l...

Страница 8: ...on Note Fix the product only to load bearing structural elements Load suspension systems only with the weight of the product Adjacent components and con necting ducts must be supported separately Use...

Страница 9: ...24 5 1500 9 5 14 18 5 23 28 33 2000 11 5 17 23 28 5 34 5 40 2500 14 5 22 29 36 5 43 5 51 3000 17 25 33 5 42 50 58 5 3500 19 28 5 38 47 5 57 66 5 4000 21 32 42 5 53 63 5 74 j No of blades k L BN mm Wei...

Страница 10: ...nsure that the panels have been correctly fixed and connected to air terminal devices if any Ensure that the water system has been filled and vented Carry out a leakage test with air or water and acco...

Отзывы: