Installation manual for automatic extract air valve
5
3. Transport, storage and packaging
Delivery check
Upon delivery, carefully remove the packaging and check the
unit for transport damage and completeness. In case of any
damage or an incomplete shipment, contact the shipping com-
pany and your supplier immediately. Put the product back into
its packaging after the delivery check to protect it from dust
and contamination.
Transport on site
Please note:
- When unloading the delivery and transporting on-site,
proceed with care and observe the symbols and notices-
on the packaging.
- Devices should preferably be transported to the installation
location in their
original packaging.
- Use only lifting and transport gear
designed for the required load.
- Always secure the load against tipping and falling.
- Cumbersome equipment should be transported with at least
two people to
prevent injury and damage.
Storage
Please note:
- Store the product only in its original packaging.
- Protect the product from the effects of weather.
- Protect the product from humidity, dust and contamination.
- Storage temperature: -10 °C to +30 °C..
- Relative humidity: 95 % max., no condensation
Packaging
Properly dispose of packaging material.
Befestigungs- und Montagematerial
Befestigungs- und Montagematerialien sind, soweit nicht
anders angegeben, kein Bestandteil der Lieferung und
müssen bauseits, abgestimmt auf die jeweilige Einbausitua-
tion beigestellt werden.