
Installation manual for automatic exhaust valve ATVC-100
9
Assembly
Once the required volume flow rate has been set and the
electric connection has been completed, the automatic exhaust
valve can be inserted into the appropriate opening so that the
casing is flush with the wall. The exhaust valve is held in the
opening by 3 spring elements.
Initial commissioning
Before you start commissioning:
- Check that the air terminal devices are seated correctly.
- Remove protective film.
- Ensure that all air terminal devices are clean and free from
residues and foreign matter.
- Check that electrical connections (if any) have
been correctly made.
- Check that the fixing and connection -
with the air duct is correct.
Volume flow rate balancing
When several diffusers are connected to just one volume flow
controller, it may be necessary to balance the volume flow
rates.
7. Electrical installation
GEFAHR!
Stromschlag beim Berühren spannungsführender
Teile. Elektrische Ausrüstungen stehen unter
gefährlicher elektrischer Spannung.
Nichtbeachtung kann Tod, schwere Körperschäden
oder Sachschaden verursachen!
– An den elektrischen Komponenten dürfen nur
Elektrofachkräfte arbeiten.
– Vor Arbeiten an der Elektrik die Versorgungs-
spannung ausschalten.
Electrical connection
Location of the electric cable
It is best to lead the electrical cable into the round air extract
opening.
Connection diagram
A 2-pin plug-in connector with protective contact is provided
for the electrical connection on site. Plug "A" can be removed
from the connector plate "C" after loosening the central screw
"B". With the central screw "B" removed from the plug "A", the
insert "F" can be pressed out with a screwdriver at the point
marked "D".