5
EN
Operating manual – air cooler PAE 25
Assembly and installation
Scope of delivery
•
Device
•
Remote control
•
Honeycomb filter
•
2 ice packs
•
Manual
Unpacking the device
1. Open the cardboard box and take the device out.
2. Completely remove the packaging.
3. Fully unwind the power cable. Make sure that the power
cable is not damaged and that you do not damage it during
unwinding.
Start-up
When positioning the device, observe the minimum distance
from walls or other objects as described in the Technical data
chapter.
A
B
C
C
D
•
Before restarting the device, check the condition of the
power cable. If there are doubts as to the sound condition,
contact the customer service.
•
Set the device up in an upright and stable position.
•
Do not create tripping hazards when laying the power
cable or other electric cables, especially when positioning
the device in the middle of the room. Use cable bridges.
•
Make sure that extension cables are completely unrolled.
•
Make sure that no curtains or other objects interfere with
the air flow.
Prior to initial start-up, insert the batteries in the remote control.
Filling the water tank
The device requires fresh drinking water for air cooling.
Observe the following when using the ice packs:
•
Put the ice packs into a freezer for at least 4 hours before
use.
•
The water tank (8) should be filled with water before
inserting the ice packs.
•
Only place the ice packs into the designated compartment
in the water tank, otherwise the pump will not function
properly.
Info
When using ice packs at high outside temperatures,
condensation may form at the water tank and drip onto
the floor.
1. Remove the water tank (8) from the device.
ð
When removing the water tank quickly, the mechanism
for lowering the pump may be released. Push the pump
back up into the housing (see chapter Errors and faults).
8
Содержание PAE 25
Страница 1: ...TRT BA PAE25 TC 002 EN PAE 25 EN OPERATING MANUAL AIR COOLER...
Страница 17: ......