background image

USER’S GUIDE

Содержание TR 12.8-110 Li-ion

Страница 1: ...USER S GUIDE...

Страница 2: ...ufacturer of the world s most trusted deep cycle batteries The battery you purchased was engineered by Trojan to deliver superior power performance durability and reliability for use in a broad range...

Страница 3: ...e optimum performance and long life from your new investment If you have any questions concerning safety precautions or for any assistance in installing or using the battery in your system contact Tro...

Страница 4: ...BATTERY INSTALLATION 7 5 PREVENTIVE MAINTENANCE 12 6 CHARGING 12 7 STORAGE AND SHIPPING 14 8 MAXIMIZING THE PERFORMANCE OF YOUR TRILLIUM BATTERY 14 9 WHAT TO EXPECT FROM YOUR TRILLIUM BATTERY 14 10 A...

Страница 5: ...in a variety of applications The line currently consists of three different models Group 24 size 12 8V 92 Ah with state of charge gauge Group 27 size 12 8V 110 Ah with state of charge gauge U1 size 2...

Страница 6: ...ederal regulations Always charge batteries before installing Never connect or disconnect terminals from batteries without first disconnecting loads Always make sure chargers are off or disconnected wh...

Страница 7: ...ributor If damage occurred in transit contact your freight carrier 4 2 TERMINALS Trillium batteries are equipped with the following terminal configurations Group 24 size M8 1 25 x 9 mm threaded hole G...

Страница 8: ...rect cable wire size which can be located at www nfpa org 4 5 TORQUE VALUES Tighten all cable connections to the proper specification to make sure there is good contact with the terminals Over tighten...

Страница 9: ...es in series and parallel EXAMPLE Two Group 27 12 8V batteries rated at 110 Ah Connected in series Two Group 27 12 8V batteries rated at 110 Ah Connected in parallel Four Group 27 12 8V batteries rate...

Страница 10: ...a minimum of 0 50 12 7 mm of space between them to allow for adequate airflow 4 11 BATTERY START UP The start up instructions below apply only to the Group 24 and Group 27 batteries The U1 battery is...

Страница 11: ...devices The battery side connector information is as follows QUANTITY PART DESIGNATION MANUFACTURER DTM AWG 20 Solid Pin 3 0460 202 20141 Deutsch DTM Receptacle 1 DTM04 3P Deutsch The user is responsi...

Страница 12: ...als and connections with a damp cloth or non metallic brush If the battery is extremely soiled a household cleaner may be used Dry with a clean cloth Keep the area around batteries clean and dry 6 CHA...

Страница 13: ...an be charged with a multi bank charging system Bulk 48V chargers may not charge all series connected batteries and may require individual battery maintenance charging at periodic intervals to fully c...

Страница 14: ...HED TO A CHARGER WHEN IT IS SHUT DOWN IT MAY TURN BACK ON When batteries are taken out of storage they should be given an initial charge as outlined in Section 6 prior to use 8 MAXIMIZING THE PERFORMA...

Страница 15: ...ery is designed to operate in a safe discharge range and will shut off to avoid damage if discharge current is detected above specified limits After cutoff the battery will restart after 30 seconds If...

Страница 16: ...a Trillium battery to provide power contact your dealer or Trojan Technical Support for assistance 11 BATTERY RECYCLING Trillium batteries are recyclable and should not be disposed of as household or...

Страница 17: ...17 U S E R S G U I D E 17 NOTES...

Страница 18: ...T R O J A N B A T T E R Y 18 NOTES...

Страница 19: ...19 U S E R S G U I D E 19...

Страница 20: ...any form without prior consent in writing from Trojan Battery Company Trojan Battery Company is not liable for direct indirect special exemplary incidental or consequential damages that may result fro...

Отзывы: