Trojan Technologies Aquafine DW Series Скачать руководство пользователя страница 14

13

prior to turning on the UV

unit, the following must be

verified:

• With water flowing through the system, ensure there
   are no system leaks and no piping connection leaks

• All earth ground connections are properly made

• All lamp connections are properly made

1. Verify that all incoming power conductors, includ-

ing the ground conductor, are properly terminated.

2. Plug in the unit.

3. Observe the UV lamp LED to verify the lamp is

operating properly.

4. Turn the power off until actual operational start up

begins.

sanitizing the system

It is imperative all discharge piping valves, faucets, etc.,
be sanitized and flushed to insure a clean start. Super-
chlorinate all plumbing lines by putting the equivalent
of two gallons or 5¼ % bleach into the well or the point
closest to the well. Open every faucet until a strong
chlorine odor is detectable. Leave this solution in all
lines for at least four hours before purging. Before
flushing lines, proceed to the next step, since UV-treated
water must be used to rinse the chlorine water from all
lines.

Next, plug in the UV unit and observe the viewing lens
to verify the UV lamp is operating. Once the UV unit is
in operation, turn on the main water supply and open
every faucet until the chlorine odor is dissipated. Start
with the faucet closest to the well or supply source.

If considerable red water and/or turbid water is noted
coming from the faucets after the super-chlorination
procedure, it is recommended that you inspect the
quartz sleeve and clean if dirty (See Maintenance
Section.)

Over time, follow-up water testing analysis can show
regrowth of bacteria in the discharge piping and
faucets; re-sanitization would then be required.

CAUTION! Rapid succes-

sive cycling of the power

to the ballast can cause

premature failure of the

system components.

Содержание Aquafine DW Series

Страница 1: ...perated Aquafine ultraviolet treatment units will provide many years of service DW Series Installation Maintenance and Operation Manual Part No 109 1 This manual covers the preliminary installation op...

Страница 2: ......

Страница 3: ...Quartz Sleeves 9 10 Installing the Ultraviolet UV Lamps 11 12 Powering Up the Ultraviolet UV Unit 13 Monitoring Devices Lamps Operational Viewport 14 Maintenance Requirements 15 Cleaning the Unit 15...

Страница 4: ...l codes 5 Properly ground the unit Failure to comply may result in severe or fatal electrical shock 6 Install the unit away from undue vibration that can damage the electrical components and UV lamps...

Страница 5: ...5 Pretreating the water with appropriate filtration and or other devices may be necessary to bring the water quality up to acceptable UV transmission levels Only then should you install and operate th...

Страница 6: ...warranty pleasefilloutand mailtheWarrantyRegistrationCardintheback pocketofthismanualandreturntoAquafineCustomer Service The following installation and operating conditions are considered hazardous or...

Страница 7: ...our option and returned to sender prepaid Before returning any part contact Aquafine Corporation for return authorization and shipping instructions This guarantee is void if the equipment has not bee...

Страница 8: ...cal components and cause premature failure of the UV lamps If your piping system is subject to impulse pressure resulting in a water hammer condition a surge tank or other means must be provided to re...

Страница 9: ...aps to isolate any such susceptible material from direct exposure to the ultraviolet light Install the UV light traps to the inlet outlet of the UV treatment chamber prior to the connec tion of any no...

Страница 10: ...wly push the sleeve through the chamber 8 Assemble the compression nut and o ring Place the o ring into the internal relief of the compression nut below the threaded area The o ring should fit into th...

Страница 11: ...emble the compression nut and o ring Place the o ring into the internal relief of the compression nut below the threaded area The o ring should fit into the com pression nut 9 Place the compression nu...

Страница 12: ...ion nut This ensures the lamp is secure within the chamber 8 The lamp pins must be pushed down to fit securely in the lamp socket connector 9 Screw the lamp socket retainer cap clockwise into place ov...

Страница 13: ...e hand push the lamp socket boot onto the end of the ultraviolet lamp and connect the opposite lamp socket When properly attached a slight snap can be felt which indicates a proper connection Verify n...

Страница 14: ...til a strong chlorine odor is detectable Leave this solution in all lines for at least four hours before purging Before flushing lines proceed to the next step since UV treated water must be used to r...

Страница 15: ...p failure buzzer option For single ended units only The buzzer is an optional accessory that is activated when the UV lamp fails to operate Upon such condi tion the LED indicator will automatically tu...

Страница 16: ...ays after use to see if any debris or film has settled on the outside If dirty follow these cleaning procedures 1 Turn off the main water to the unit 2 Disconnect the electrical power to the unit 3 Re...

Страница 17: ...ballast by pulling it towards you Discard the old or defective ballast 6 Install the new ballast securing it with the bolt removed earlier 7 Tighten the bolt with 5 32 L shaped hex wrench 8 Reconnect...

Страница 18: ...spillage 3 After the valve has been left fully open for three and one half minutes reduce the flow to a reasonable stream of water not less than 50 of full flow Continue flowing to drain three additi...

Страница 19: ...18517 DW 5 Parts 1 Ballast 120 Volt 18855 2 UV lamps standard SE 254 mauve 19306 3 Quartz sleeves domed 19330 DW 8Single Ended SE Parts 1 UV lamps standard SE 254 mauve 17491 2 Quartz sleeves domed 1...

Отзывы: