![Triumf 24952 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/triumf/24952/24952_manual_1169564005.webp)
Despite the time consumption associated with dismantling workspace is time saving as well as
a guaranteed result of the work. The working comfort is unparalleled advantage with the time
required for removal of the above-mentioned parts.
Before installation of drilling mechanism is necessary to dismantle the injector in order to
properly drilling block centering with respect to the exact positioning or centering and drilling
tip for broken stud M8.
The process of removing the original stud including new stud installing is a matter of minutes
(10-15 minutes).
Tool construction:
The base of stud drilling out set are 4 rails that create the support frame with pre-drilled holes
on the localization longitudinal rails. Then you install drilling out mechanism where the final
position of drilling out block can tune / finely set the centering flap. It allows removal and
insertion of the drilling unit or use correction tap without re-setting the individual parameters.
Workers can continue his work where was interrupted and begin there. During the work it can
be easily lubricated, removing chips and control of the drill tip.
Downforce actually in drilling out is balanced due to the leveraging mechanism. Drill
machine
is
still
at
the
same
angle
thanks
to
centering
sleeves.
Position of drill machine is aligned with guide sleeves. Force transferring also in higher
pressure is smooth, given the installed bearings.
Picture 6.
Detail photo injector retaining bolt M8x1,25