background image

11

ELECTRICAL CONNECTIONS

SWITCH OFF THE ELECTRICITY SUPPLY  
AT THE MAINS.

Fig.8 

shows a schematic wiring diagram

The cable can be surface clipped, hidden or 
via 20mm conduit. For this handwash unit the 
minimum cable size will be 1.5mm².
The supply cable earth conductor must be 
sleeved. The outer sheath of the supply cable 
must be stripped back to the minimum. For top 
cable entry, remove sufficient outer sheath to 
assist routing beneath and looping back into the 
terminal block - DO NOT remove too much.
Conduit entry can only be from rear. Route the 
cable into the unit and connect to the terminal 
block (

fig.9

) as follows:

Earth cable to terminal marked 
Neutral cable to terminal marked  N
Live cable to terminal marked  L

IMPORTANT

: When connecting the cable, fully 

tighten the terminal block screws and make sure 
that no cable insulation is trapped under the 
screws - loose connections can result in cable 
overheating. Make sure the cable is fully secured 
by the cable clamp provided (

fig.10

). If top 

entry is used, move the cable clamp from its 
position at the bottom entry position to the top 
entry position.

The use of connections within the unit, or other 
points in the circuit, to supply power to other 
equipment i.e. extractor fans, pumps etc. will 
invalidate the guarantee.
DO NOT switch on the electricity supply 
until the cover has been fitted and the unit 
commissioned.

L N

E

1

2

4

3

1.

  Terminal block

2.

  Thermal cut-out

3.

  Microswitch

4.

 

 Element

Fig.8

Terminal 
block

Fig.9

Fig.10

Содержание T30i

Страница 1: ...n the sequence of this instruction book IMPORTANT SAFETY ADVICE The swivel arm supplied with this product is a safety critical part of your shower Failure to use genuine Triton parts may cause injury...

Страница 2: ...ny tap or fitting other than those specified This appliance is intended to be permanently connected to the water mains and not connected by a hose set A suitable double pole isolation switch for suppl...

Страница 3: ...thin 300mm of the handwash unit as heat can transfer along the pipework and damage components 2 4 DO NOT fit any form of outlet flow control as the outlet acts as a vent for the heater can 2 5 DO NOT...

Страница 4: ...DO NOT place items such as soap or shampoo bottles on top of the unit Liquid could seep through the joint between the cover and back plate and possibly damage the sealing rubber If water becomes too...

Страница 5: ...it 8 Fitting the unit to the wall 9 Plumbing connections 10 Electrical connections 11 Fitting the swivel arm and cover 12 Commissioning 13 Operating the handwash 14 Operating functions 14 Cleaning 15...

Страница 6: ...lamp bottom 4 Mircoswitch 5 Stabiliser valve 6 Pressure Relief Device PRD 7 Can assembly 3kW 8 Thermal Cut Out TCO 9 Outlet pipe 10 Cover Package Contents Handwash unit Cover screw pack 200mm swivel a...

Страница 7: ...g 2 within the unit 2 Before making any sort of electrical connection within the installation make sure that no terminal is live If in any doubt switch off the whole installation at the consumer unit...

Страница 8: ...ater inlet mains pipework Fig 3 shows a typical system layout DO NOT use jointing compounds on any pipe fittings for the installation Isolating stopvalve Mains water supply Handwash Diagrammatic view...

Страница 9: ...fig 4 Procedure Position the unit on the wall and using the backplate as a template mark the two fixing holes fig 5 Drill and plug the wall An appropriate drill bit should be used If the wall is bric...

Страница 10: ...be flushed before the unit is fitted This is to remove any debris within the inlet pipework Procedure Turn off the water supply either at the mains stop valve or the isolating stop valve Make sure the...

Страница 11: ...rminal marked Neutral cable to terminal marked N Live cable to terminal marked L IMPORTANT When connecting the cable fully tighten the terminal block screws and make sure that no cable insulation is t...

Страница 12: ...ol so that it points at the position fig 12 Replace the cover squarely to the backplate and guide into position so that the control locates correctly into the splined spindle Should any difficulty ari...

Страница 13: ...l arm then rotate the control fully clockwise to the maximum flow position fig 15 It will take about thirty seconds for a smooth flow of water to be obtained while air and any debris is being disperse...

Страница 14: ...ly permanently connected to the handwash unit when not in use OPERATING FUNCTIONS Low Water Pressure Cut out If the water pressure falls below the minimum required for correct operation of the unit po...

Страница 15: ...y should be cleaned at regular intervals to prevent build up of deposits from the water supply Blocked spray holes can reduce the water flow to such an extent that it will cause the thermal cut out or...

Страница 16: ...oltage The temperature of the water supply can vary from 5 C in the winter to about 20 C in summer with an average of about 12 C The table below shows a scenario of the water temperature you can expec...

Страница 17: ...s If it continues contact Triton Customer Experience 4 1 1 Reduce the flow rate 4 2 1 Is water supply mains or tank fed 4 2 2 If tank fed replumb to mains water supply or see 4 2 4 4 2 3 If mains fed...

Страница 18: ...ter pressure has dropped below minimum required 6 1 Blocked sprayhead 5 1 1 Wait until the water pressure resumes to normal 6 1 1 Clean or replace sprayhead and then fit new PRD Note Identify cause of...

Страница 19: ...ll our electric products are labelled accordingly with the crossed out wheeled bin symbol This indicates for disposal purposes at end of life that these products must be taken to recognised collection...

Страница 20: ...should be made by credit debit card excluding American Express or Diners Card Payment can also be made by pre payment of a pro forma invoice by cheque or postal order Telephone orders are based on in...

Отзывы: