background image

3

GB

Parts List / Assembly

PARTS LIST 

1.  Front Jaw (1)
2.  Rear Jaw (1)
3.  Coach Bolts (4)
4.  Mounting Knobs (4)
 

ASSEMBLY

REMOVING THE URETHANE JAW FACINGS 
Step 1 

Remove the fixed jaw facing: use a screwdriver or 

similar to pry the facing off the fixed jaw.

Step 2 

Remove the moving jaw facing: Push the backing 

face to the right (when viewed from the front of the 

Superjaws) to disengage the connection pins. You can 

then remove first the backing face and then the font 

face.

FITTING THE ENGINEERS JAWS

See Diagram, page 3

Step 1

Position the Front Jaw (1) onto the fixed jaw so that 

the flanged edge is located on top of the fixed jaw.

Step 2

Thread the Coach Bolts (3) through the aligned fixing 

holes in the Engineers Jaws and the fixed jaw, so that 

the bolt heads locate in the fixing positions in the front 

of the Engineers jaws. 

Step 3 

Fit the Mounting Knobs (4) onto the bolts and tighten 

to secure the Front Jaw (1) in position.

Step 4 

  Position the Rear Jaw (2) onto the moving jaw so 

that the flanges locate over the top and bottom of the 

moving jaw

  Step 5
 

Secure the Rear Jaw (2) using the remaining Coach 

Bolts (3) and Mounting Knobs (4)

1

3

2

4

3

4

Отзывы: