3
GB
Parts List / Assembly
PARTS LIST
1. Front Jaw (1)
2. Rear Jaw (1)
3. Coach Bolts (4)
4. Mounting Knobs (4)
ASSEMBLY
REMOVING THE URETHANE JAW FACINGS
Step 1
Remove the fixed jaw facing: use a screwdriver or
similar to pry the facing off the fixed jaw.
Step 2
Remove the moving jaw facing: Push the backing
face to the right (when viewed from the front of the
Superjaws) to disengage the connection pins. You can
then remove first the backing face and then the font
face.
FITTING THE ENGINEERS JAWS
See Diagram, page 3
Step 1
Position the Front Jaw (1) onto the fixed jaw so that
the flanged edge is located on top of the fixed jaw.
Step 2
Thread the Coach Bolts (3) through the aligned fixing
holes in the Engineers Jaws and the fixed jaw, so that
the bolt heads locate in the fixing positions in the front
of the Engineers jaws.
Step 3
Fit the Mounting Knobs (4) onto the bolts and tighten
to secure the Front Jaw (1) in position.
Step 4
Position the Rear Jaw (2) onto the moving jaw so
that the flanges locate over the top and bottom of the
moving jaw
Step 5
Secure the Rear Jaw (2) using the remaining Coach
Bolts (3) and Mounting Knobs (4)
1
3
2
4
3
4