Triton Neptune TRI Series Скачать руководство пользователя страница 14

     

14

DRILLED WELLS:

 

1. Remove the cap or seal from the casing and measure the depth of the water in the well, then refer to  

 

Table 1 to determine how many chlorine pellets should be used.  In some instances removing the seal  

 

to measure the water can be a difficult task, and it is easier to estimate well and water depth from well  

 

log or other records.

 

2. Remove well cap and determine if there is an unobstructed path from the top of the well to the  

 

water level.  If it is not possible to remove the well cap, remove vent or sanitation access plug.

 

3. Drop one pellet into the well and listen to hear if it hits the water.  If the pellet hits the water, drop  

 

one-half the number of pellets determined to be needed into the well.  These will sink to the bottom  

 

and sanitize the lower part of the well.

 

4. Mix the remaining pellets in a few gallons of water in a CLEAN plastic container and pour the 

 

solution into the well.

 

5. In order to mix the chlorine thoroughly throughout the entire water system, it is necessary to    

 

recirculate the water in the well.  This can be accomplished by connection a hose to an out side faucet  

 

that is located after the pressure tank.  Use hose to run water back down the well (this also rinses upper  

 

portion of well).  After about 15 minutes of recirculation the water, a strong chlorine odor should be  

 

apparent.  Turn off hose.

 

6. Bypass water softener and filters and open each water outlet in the water system until chlorine is  

 

present in water.  This procedure assures that all the water in the system is chlorinated.

 

7. Allow the chlorinated water to stand in the system for at least one (1) hour, and preferable overnight.   

 

After this, open an outside faucet system until water runs chlorine free.  Repeat flush operation on each  

 faucet 

 

in 

system.

 

 

 

NOTE:

 

 

A. Chlorine may break loose iron deposits, slime and organic material.  This material will make  

 

 

the water run colored.  The material broken loose may plug pump screens.  

Do not continue to  

 

 

run pump if water doesn’t flow.

 

 

B. The high level of chlorine required to sanitize a water system is corrosive to most metals and  

  chlorine 

solution 

must 

not

 be allowed to remain in water system more than 36 hours before  

 

 

being completely flushed from system.

 

8. After system has been completely flushed, perform a bacteriological analysis on the water 

 

following all applicable procedures.

 

NOTE:

  

Always follow the sanitizing procedure required by applicable state or local laws.

EPA Registered:  

Well sanitizer pellets are EPA Registered for sanitizing potable water.  EPA Registration 

No. 50510-1

Содержание Neptune TRI Series

Страница 1: ...on Systems Model TRI 8 TRI 12 TRI 20 It is important that those responsible for the installation of this equipment as well as the owner operator read this manual and carefully follow the instructions...

Страница 2: ...nded or sold by the manufacturer distributor may cause an unsafe condition 7 Intended for indoor use Do not install this disinfection system where it will be exposed to the weather Do not store this d...

Страница 3: ...on equipment may be required if these parameters cannot be maintained Flow rate must not exceed rated capacity of the unit DESCRIPTION OF EQUIPMENT The Triton series has an unique design with an ultra...

Страница 4: ...always be properly grounded INSTALLATION The Triton series are always placed after the pressure tank and any other type of treatment devices i e softeners filters These units are normally installed in...

Страница 5: ...selected Simply hand press or slightly tap in the flow control until it sits on the inside ledge of the machined port 3 Using the mounting box provided secure unit to wall or other surface Make sure t...

Страница 6: ...6...

Страница 7: ...is operational 4 Set the 1 Year Lamp Timer WITH NEW UV LAMP Make sure the control box is plugged into the wall outlet and the UV lamp is on Press and hold the reset button Hold the reset button down f...

Страница 8: ...8...

Страница 9: ...the quartz sleeve After sufficient film has formed on the quartz sleeve the ability of the ultraviolet germicidal rays to pass though the quartz sleeve and into the water may be impaired Therefore it...

Страница 10: ...V to effectively kill bacteria Failure to replace the U V lamps every 9 000 hours may cause bacteriological breakthrough Should the use of the disinfection unit be intermittent in no case should the...

Страница 11: ...to determine how much chlorine solution should be used In some instances removing the seal to measure the water can be a difficult task and it is easier to guess at the quantity of disinfectant needed...

Страница 12: ...w to protect wells and springs and keep them from becoming contaminated call or visit your local Cooperative Extension office or your nearest certified water treatment specialist TABLE 1 Quantity of s...

Страница 13: ...Water System Using Well Sanitizer Pellets Table 1 Well Diameter Inches Weight of Pellets lbs oz Cups of Pellets Number of Pellets To produce a 400 P P M chlorine dosage NOTE Pellets Weight 1 14 gram e...

Страница 14: ...n water back down the well this also rinses upper portion of well After about 15 minutes of recirculation the water a strong chlorine odor should be apparent Turn off hose 6 Bypass water softener and...

Страница 15: ...gulator or above 120 volts Line cord disconnected Check replace or outlet defective Defective U V lamp Replace Defective lamp ballast Check output voltage Replace ballast Loose open circuit wire Trace...

Страница 16: ...ibutor freight paid It is the dealer customer responsibility to reinstall any components which require replacement under warranty No labor will be covered under this Limited Warranty Neptune U V Disin...

Страница 17: ...pe Size Overall Dimensions Shipping GPM 120V 120V L x W x D Weight TRI 8 8 1 0 03 0 25 3 4 MIP 21 x 3 5 x 3 5 9 Lbs TRI 12 12 1 0 03 0 25 3 4 MIP 32 x 3 5 x 3 5 18 Lbs TRI 20 20 1 0 03 0 25 1 MIP 35 x...

Страница 18: ...bottle or sterile container being used Holding the cap in a down position the operator should then hold his breath while taking the sample so as to avoid oral contamination of the sample The operator...

Страница 19: ...19 WIRING DIAGRAM...

Страница 20: ...20 7 7 5 1 2 5 5 1 67 03 21752 2 5 5 5 2 0 3 8 0 287 7...

Страница 21: ...21 DRAWING AND PART NUMBERS...

Страница 22: ...ort Nut 1 7 WTA 268 Top Mounting Bracket 1 8 WTA5 410 Lock Nut 1 9 WTA8 544 End Nut O Ring seal quartz sleeve 1 10 WTA5 409 Brass End Nut 1 11 WTA8 546 O Ring for shroud on end nut 1 12 WTA 7091 Gayno...

Страница 23: ...Port Nut 1 7 WTA 268 Top Mounting Bracket 1 8 WTA5 410 Lock Nut 1 9 WTA8 544 End Nut O Ring seal quartz sleeve 1 10 WTA5 409 Brass End Nut 1 11 WTA8 546 O Ring for shroud on end nut 1 12 WTA 7091 Gayn...

Страница 24: ...TA5 410 Lock Nut 1 7 WTA8 544 End Nut O Ring seal quartz sleeve 1 8 WTA5 409 Brass End Nut 1 9 WTA8 546 O Ring for shroud on end nut 1 10 WTA 7091 Gaynor Connector 1 11 HS4 075 BK Shrink Tubing 167 12...

Страница 25: ...0 12 3 57 180 5 6 5 37 21 47 76 2 76 RQWURO RDUG R URQW 76 76 RQWURO RDUG 76 RUNKRUVH DOODVW 76 0 1 ORQ 6WDQGRII 76 2 76 RQWURO RDUG R DFN 2XWOHW 76 0 RYHU 6FUHZV 76 6WUDLQ 5HOLHI 76 OHFWULFDO 3OXJ 7...

Страница 26: ...26 NOTES...

Страница 27: ...27 NOTES...

Страница 28: ......

Отзывы: