Triton INSTAFLOW Скачать руководство пользователя страница 13

UNVENTED STORED WATER HEATER

13

LEAK TESTING

Flush out the pipework to remove any 
debris. Open the water isolating valves 
and check for leaks.
Rectify any leaks found before 
proceeding with commissioning.

COMMISSIONING

Important: This procedure must be 
completed with the electricity switched 

OFF

 at the isolating switch. 

Fully open the outlet tap and allow 
the water heater to fill until a smooth 
water flow is obtained; allow time for 
air and any debris to be flushed from 
the unit. Once flushing out has been 
completed, stop the water flow by 
turning off the outlet tap. 
Plug the water heater in and switch on 
the electricity supply. The water heater 
is now ready for normal use. 

Содержание INSTAFLOW

Страница 1: ...uence of this instruction book Power Heating Av a i l a b l e i n 3 t a n k c a p a c i t i e s FOR YOUR SERVICE REFERENCE NOTE DOWN THE PRODUCT CODE BELOW FROM THE FRONT OR TOP OF THE BOX ALTERNATIVE...

Страница 2: ...21 WARNINGS DO NOT operate the water heater if frozen or suspected of being frozen It must thaw out before use DO NOT operate the water heater if it becomes damaged DO NOT operate the water heater if...

Страница 3: ...hould the water heater be mounted upside down with the inlet outlet pipes pointing downwards PLUMBING REQUIREMENTS DO NOT install where the water heater could become frozen DO NOT connect to any form...

Страница 4: ...sure 600 kPa 6 bar Minimum inlet temperature 5 C Inlet connection 1 2 BSP Outlet connection 1 2 BSP MATERIALS ABS Front and rear cover maintenance cover Minerally insulated corrosion resistant metal s...

Страница 5: ...itched on electrically Details of product installation can be found from page 10 to 13 inclusive PRESSURE RELIEF VALVE 83317580 The pressure relief valve PRV supplied with this water heater MUST be fi...

Страница 6: ...ontrol panel and safety pressure relief valve DRAINING PROCESS If it becomes necessary to drain the product follow the procedure below 1 Cut off the power supply 2 Turn on the hot water tap to drain w...

Страница 7: ...NING 13 OPERATING THE WATER HEATER 14 MAINTENANCE 15 FAULT FINDING 16 SPARE PARTS 17 GUARANTEE SERVICE POLICY ETC REAR COVER Model 5 litre 10 litre 15 litre Declared load profile XXS XXS XXS Energy ef...

Страница 8: ...NVENTED STORED WATER HEATER 8 DIMENSIONS 290 1 5mm 100 1 5mm 311 1 5mm 269 7 1 5mm G1 2 80 7 1 5mm 1 86005800 5L 5 LITRE 345 1 8mm 100 1 5mm 366 1 8mm 299 9 2mm G1 2 93 2 1 5mm 1 86005810 10L 10 LITRE...

Страница 9: ...contents to make sure all parts are present 1 Installation and operating instructions 2 Instaflow water heater 3 Wall bracket 4 1 2m cable fitted with UK plug 5 Screws and wall plugs suitable for bric...

Страница 10: ...r Install the water heater where it will be close to the water source and power socket Guarantee that there is clear access to the front maintenance panel of the water heater Take care to avoid cables...

Страница 11: ...f Discharge Isolating valve Kit B 350 kPa 3 5 bar pressure reducing valve Kit A 2 litre expansion vessel and non return valve Non return valve Kit C Tundish Power Heating Fig 2 Fig 3 Typical installat...

Страница 12: ...the wall An appropriate drill but should be used Note If the wall is plasterboard or a soft building brick please select an appropriate wall fixing method this is beyond the scope of this installation...

Страница 13: ...dure must be completed with the electricity switched OFF at the isolating switch Fully open the outlet tap and allow the water heater to fill until a smooth water flow is obtained allow time for air a...

Страница 14: ...ater temperature reach excessive values If this device is activated you should call our Triton Customer Experience helpline Pressure will increase when the temperature increases by releasing the exces...

Страница 15: ...e must not be obstructed and for regions with hard water it must be descaled as necessary Sacrificial Anode The magnesium anode has been designed to protect the water tank from corrosion and will degr...

Страница 16: ...ot water all the time Thermostat has failed Fit new component Dripping while heating Isolating valve has been fitted within the distance required for expansion Expansion vessel charge may have failed...

Страница 17: ...WEE EJ3466QV All our electric products are labelled accordingly with the crossed out wheeled bin symbol This indicates for disposal purposes at end of life that these products must be taken to recogni...

Страница 18: ...UNVENTED STORED WATER HEATER 18...

Страница 19: ...UNVENTED STORED WATER HEATER 19...

Страница 20: ...should be made by credit debit card excluding American Express or Diners Card Payment can also be made by pre payment of a pro forma invoice by cheque or postal order Telephone orders are based on in...

Отзывы: