Bezique II electric shower
rePlaCIng the Cover
Important:
Before finally fitting the cover,
the following steps must be taken:
a.
check the plumbing connections are
watertight.
b.
check the terminal block screws are fully
tightened.
c.
make sure the pipe and cable entering
the unit do not prevent the cover locating
correctly to the backplate.
d.
Rotate the valve spindle fully clockwise
until the spindle hits the ‘stop’
(fig.0).
Do not force the spindle.
e.
turn the temperature control on the cover
to position ‘10’
(fig.)
.
Offer the cover to the unit.
Carefully locate the cover tags into the guide
pockets on the backplate and make sure the
wires are not trapped.
Guide the cover into position so that the knob
spindle locates correctly (minor adjustment may
be necessary to align the knob and spindle).
Should any difficulty arise, recheck the points
above.
While applying slight pressure to the front
cover, secure in position with the three retaining
screws.
Turn on the electric supply back at the isolating
switch. The POWER indicator will light. No
water will flow until one of the three buttons are
pressed.
note:
It is recommended that the water and
electric supplies to the shower are turned off
while the riser rail kit is being installed.
The flexible hose can be left attached to the
shower outlet. Make sure the supplied sealing
washer is fitted.
!320*)
9DOYH
VSLQGOH
Fig.0
Fig.