Triton ASPIRANTE Series Скачать руководство пользователя страница 6

4

Aspirante pumped electric

ELECTRICAL REQUIREMENTS

The installation, supply cable and circuit
protection must conform with IEE wiring
regulations and be sufficient for the
amperage required.

The following notes are for guidance only:

1

The shower must only be connected to a
230-240V ac supply. If you are installing a
shower with a kilowatt rating above 9kW,
it is advisable to contact the local
electricity supply company.

Fig.2

WARNING!

THIS APPLIANCE MUST BE EARTHED

Meter

Incoming

supply

fuse

Meter

tails

Consumer
unit

Pull cord
isolating switch

Shower unit

Fuse or

mcb

RCD

(can be part of

consumer unit)

80A or 100A

main switch

Fig.3  

Schematic of installation circuit

1.1

The electrical rating of the shower is
shown on the rating label 

(fig.2)

within

the unit.

2

Before making any sort of electrical
connection within the installation, make
sure that no terminal is live. If in any
doubt, switch off the whole installation at
the consumer unit.

3

The shower must be connected to its own
independent electrical circuit. IT MUST
NOT be connected to a ring main, spur,
socket outlet, lighting circuit or cooker
circuit.

3.1

The electrical supply must be adequate for
the loading of the unit and existing
circuits.

4

Check your consumer unit (main fuse
box) has a main switch rating of 80A or
above and that it has a spare fuse way
which will take the fuse or miniature
circuit breaker (MCB) necessary for the
shower 

(fig.3)

.

4.1

If your consumer unit has a rating below
80A or if there is no spare fuse way, then
the installation will not be straightforward
and may require a new consumer unit
serving the house or just the shower.

4.2

You will need to contact the local
electricity company. They will check the
supply and carry out what is necessary.
They will also check the main bonding.

5

The earth continuity conductor of the

CIRCUIT PROTECTION

unit

cartridge

rating

MCB

fuse

7.0kW

30/32A

30A

7.5kW

32A

35A

8.0kW

40A

35A

8.5kW

40A

45A

9.0kW

40A

45A

9.5kW

40/45A

45A

10.5kW

45A

45A

Table A

Содержание ASPIRANTE Series

Страница 1: ...INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER 2180445D May 2005 Aspirante pumped electric shower Installation and operating instructions...

Страница 2: ...hose and sprayhead 15 Operating the shower 16 17 Operating functions 17 18 Adjusting the sprayhead 18 Cleaning 19 Instructions for installers and service engineers only 20 Spare parts 21 22 Fault fin...

Страница 3: ...electrical connections 3 ELECTRICAL 3 1 The installation must comply with BS 7671 Requirements for electrical installations IEE wiring regulations Building Regulations or any particular regulations a...

Страница 4: ...e with European Community Directives CE ADVICE TO USERS The following points will help you understand how the shower operates a The electric heating elements operate at a constant rate at your chosen...

Страница 5: ...l block 9 Can and element assembly 10 Area for bottom and back pipe cable entry 11 Pressure switch 12 Temperature valve 13 Solenoid valve 14 Earth connection 15 Inlet pipe 16 Filter 17 Thermal cut out...

Страница 6: ...switch off the whole installation at the consumer unit 3 The shower must be connected to its own independent electrical circuit IT MUST NOT be connected to a ring main spur socket outlet lighting circ...

Страница 7: ...ated in any rooms other than bathrooms all socket outlets in those rooms must be protected by a 30mA RCD 9 To obtain full advantage of the power provided by the shower use the shortest cable route pos...

Страница 8: ...a lower level Note The supply pipe from the cistern should be on the opposite side to the float operated valve to prevent air being drawn into the pipe when the cistern is filling If it is intended t...

Страница 9: ...up of pressure occur within the shower DO NOT operate the shower with a damaged or kinked shower hose or a blocked sprayhead which can cause the PRD to operate When commissioning the sprayhead must be...

Страница 10: ...ing will be partially behind the surface of the wall fig 10 This area must be left clear when plastering over the pipework to make the nut accessible for future adjustments Note Make sure the hole in...

Страница 11: ...he plumbing connections have been completed Note A temporary factory fitted locking screw is fitted to the power selector spindle fig 16 This is to make sure the spindle is in the Cold position while...

Страница 12: ...water supply to the inlet of the shower flush out the pipework to remove all swarf and system debris This can be achieved by connecting a hose to the pipework and turning on the water supply long eno...

Страница 13: ...cable overheating Note The supply cable earth conductor must be sleeved The outer sheath of the supply cable must be stripped back to the minimum The supply cable must be secured either by routing thr...

Страница 14: ...16 it can be removed when the commissioning procedure has been completed Make sure the water supply is still turned on to the shower Open the bleed screw on the pump unit fig 17 by rotating one revolu...

Страница 15: ...r indicator will light and the pump starts to operate It will take about thirty seconds for a smooth flow of water to be obtained while air and any debris is being flushed from the shower When a smoot...

Страница 16: ...appropriate masonry drill but if wall is plasterboard or a soft building block you must use suitable wallplugs and a suitable drill bit With the saddle spacer and lever parts to hand screw the saddle...

Страница 17: ...y in the soap dish fig 31 so that the dish is held at the required height on the rail FITTING THE HOSE AND SPRAYHEAD Feed the flexible hose through the soap dish opening fig 32 so that the dish acts a...

Страница 18: ...low setting for extra economy during warmer months Temperature adjustment at this setting is via the temperature control Single red symbol is the medium setting for economy during warmer months and a...

Страница 19: ...wering Special consideration should be given to young children and the less able bodied OPERATING FUNCTIONS Power on indicator fig 36 The power neon will light when the Start Stop button is pressed Th...

Страница 20: ...unit the device will disconnect the heating elements It will require a visit from a qualified engineer to determine the nature of the fault and replace the safety device once the unit has been repair...

Страница 21: ...cartridge firmly and continue to twist anti clockwise Having loosened the sprayplate it can be unscrewed and removed completely Clean the sprayplate with a suitable brush or preferably leave it to soa...

Страница 22: ...rrying out repairs or service to other areas of the shower unit Unscrew the filter fig 40 by turning anti clockwise Remove the unit complete with the filter and wash under running water Make sure all...

Страница 23: ...sembly dual rated 240V 230V 9 5kW 8 7kW 84500790 5 Selector switch microswitch wire assy 82500250 6 Flow valve assembly 82100310 7 Inlet pipe assembly 83306460 5 1 2 6 4 3 9 8 7 10 Ref Description Par...

Страница 24: ...ode sprayhead chrome 22011130 12 Brackets pair chrome 83306170 13 Riser rail plated chrome 7042412 14 Sprayhead holder chrome 83306200 15 Soap dish clear 22008970 16 Flexible hose chrome effect 281000...

Страница 25: ...ian 1 2 1 Remove the cover and make sure the plug and socket are firmly connected 1 3 1 Have solenoid checked by a competent electrician or contact Customer Service 1 4 1 If the power neon is lit when...

Страница 26: ...t removed while commissioning 5 1 1 See 1 1 1 and 1 1 2 5 2 1 Switch off immediately Have solenoid checked by a competent electrician or contact Customer Service 5 3 1 See 1 5 1 6 1 1 Check the filter...

Страница 27: ...25 Aspirante pumped electric UKAS QUALITY MANAGEMENT 003...

Страница 28: ...roup Holdings Limited Earthridge Customer Service Republic of Ireland 01 628 6711 01 628 6845 Service Policy In the event of a complaint occurring thefollowing procedure should be followed 1 Telephone...

Отзывы: