
Dual control thermostatic mixer
9
250mm approx.
Channel for incoming
pipework (rising shown)
Channel for outlet
pipe to fixed head or
bulkhead fitting
Recess at least
60mm deep
Recess for valve
body at least
65mm deep
Go to the
‘connecting supply pipes’
section.
d) Installation in a panel or cubicle
When installing into a panel or cubicle structure
the installer will need to consider building
supports or other options. Such options are
beyond the scope of this guide.
There should be at least 65mm space from the
surface of the panel to the rear of the valve
body.
IMPORTANT:
Access to the rear of the valve
must be available.
Decide on the shower position and determine
whether the hot and cold water supplies will
enter the shower from the top (falling) or
bottom (rising) or rear. Mark the route of the
incoming and outgoing pipework.
The control knobs require two holes to be cut
out of the panel or cubicle. Use the face plate
as a template to mark the hole positions then
extend further to allow access for the filters.
Route the pipework to valve position.
Flush out the pipework in accordance
with Water Regulations and Byelaws.
Offer the valve up to the pipework and secure
with screws through the two fixing brackets on
the valve body.
CONNECTING SUPPLY PIPES
Connect the hot water supply to the inlet
marked ‘H’ and connect the cold water supply
to the inlet marked ‘C’.
Tighten all compression fittings.
Fig.9
Содержание Antares
Страница 18: ...Dual control thermostatic mixer 16 ...
Страница 19: ...Dual control thermostatic mixer 17 ...