14_Installation
3. Additional ballasting, easternmost and westernmost row
If the module at the eastern edge has a western neighbouring module or, re-
spectively, the one on the western edge has an eastern neighbouring modu-
le, that part of the ballast exceeding 40 kg may also be placed outside of the
field on the east or west side respectively.
Ballasting is effected in three steps:
Step 1: Cut to length series connector 340 mm and push series connector 80
mm into the bottom profile. Bend bottom profile and series connector.
Step 2:
Cut to length two bottom profiles 200 mm and one bottom profile 300 mm;
as well as two protective building mats 220 mm and one protective building
mat 320 mm. Place protective bottom mat under the bottom profile. Click se-
ries connector into bottom profile 300 mm and bend.
Laterally place one bottom profile each and one protective bottom mat left
and right from the series connector, centrically adjusted to the plate width.
Step 3: Place the required ballast stones (provided on site) in the middle.
4. Additional ballasting, northernmost and southernmost row, as well as
middle of the module field
This ballasting method can also be optionally used for the westernmost and
easternmost row.
If the required ballasting per module cannot be realized with ballasting on
the bottom profiles, two L-profiles are placed under the module with a late-
ral space from a ballast plate.
At the end of the row, the L-profiles are aligned flush on the bottom profile.
On the other side, they extend over the bottom profile.
The ballast stones are placed and should be distributed, as far as possible,
over the corner areas of the module surface.