5
Rack Assembly
8
Insert the left rear vertical mounting rail’s holes through the rear
threaded M8 studs of the bottom and top side brackets
A
.
Then insert the right rear vertical mounting rail’s holes through the
rear threaded M8 studs of the bottom and top side brackets
B
.
Fasten with two M8 acorn/cap nuts
C
and an M6 Screw
D
.
9
Optional Cable Management Hooks:
Fasten the included cable
management hooks
A
to the vertical rack rails with the included
screws
B
.
7
Insert the rear base bracket’s holes through the rear threaded
M8 studs of the bottom side brackets
A
. Then insert the rear top
bracket’s holes through the rear threaded M8 studs of the top
side brackets
B
.
8
9
7
A
B
A
A
B
A
C
C
D
D
C
B