background image

 

Date: June 14th, 2019                  Doc No:  

PS-M-0693

         Ver. A                       Page 25 of 29 

日期:

2019

6

14

     

文件编号:

 

PS-M-0693

     

发行版本号:

A      

25

页,共

29

 

  Submit the Customer Feedback form  at: 

http://www.trinasolar.com/

  and  one  of 

our technical service representatives will contact you within 5 business days. A 
username  and  password  is  required  to  send  feedback  from  the  customer 
service link. 

请通过

http://www.trinasolar.com/

交《客户反馈信息表》。我司的技术服务代

表会在

5

个工作日内与您联系。

 

所需用户名和密码会通过客户服务链接发送。

 

  For 

module 

specifications 

or 

datasheets, 

please 

download 

from: 

http://www.trinasolar.com/

 

请在

http://www.trinasolar.com/

上下载关于组件的规格或数据表。

 

 

Attachment 1

SITE SELECTION and Title Angle  

场地选择和倾角选择

 

  Solar  modules  are  recommended  to  be  installed  at  an  optimized  tilt  angle  to 

maximize the energy output. It is roughly equal to the latitude of the project site 
as  a  rule  of  thumb,  facing  toward  the  equator.  Optimized  system  designs 
incorporate other local requirements. 

建议通过优化的倾斜角安装太阳能组件以达到能量输出最大化。一般来说它大致
等同于项目所在地的纬度,面向赤道方向。

 

但在实际的设计中还是按照当地具体

情况设计并找出最佳倾斜角。

 

 

When installing solar modules on a roof, the roof must be covered with a layer 
of fireproof material applicable to this class, and adequate ventilation must be 
ensured  between  the  back  sheet  and  the  installation  surface.  A  safe  working 
area also must be left between the edge of the  roof  and  the  external  edge  of 
the solar array 

当在屋顶上安装太阳能组件时,屋顶上必须要覆盖有一层适用于该等级的防火材
料,并且保证背面和安装面之间充分的通风,要在屋顶边缘和太阳能阵列的外边
缘之间留出安全的工作区域。

 

  In the case of residential installations on the ground, modules shall be installed 

following local regulations, e.g. using fence. 

如果住宅设施在地面上,组件的安装应按照当地法规进行,例如安装中需要用到
围栏

 

  Position the modules to minimize the chances of shading at any time of the day. 

对组件进行定位以尽量减少其在一天中任何时间段遮光的可能性。

 

  Trina  Solar  recommends  that  the  module  should  be  installed  at  a  working 

ambient  temperature  of  -20

~46

.  The  module's  limit  working  ambient 

temperature range is from -40

 to 85

天合推荐组件工作环境温度为

-20

~46

℃的环境,组件的极限工作环境温度为

-

40

~85

℃。

  

  Try to install modules in a location where there is rare  shading  throughout  the 

year 

尽量将组件安装在一年中罕有遮阳的位置

 

  If you are planning to use the PV modules where the water damage (Humidity: 

 85RH%) may be possible, please  consult  with  Trina  local  technical  support 

first  to  determine  an  appropriate  installation  method  ,  or  to  determine  whether 
the installation is possible.  

Содержание DUOMAX Series

Страница 1: ... SECONDARY TRANSPORT AND WARNNING 二次运输及注意 事项 6 3 4 STORAGE 存储 7 4 UNPACKING INTRODUCTION 拆包说明 7 4 1 UNPACKING SAFETY 拆包安全 7 4 2 UNPACKING STEP 拆包步骤 8 5 INSTALLATION 安装 9 5 1 INSTALLATION SAFETY 安装安全 10 5 2 INSTALLATION METHOD 安装方法 11 6 MODULE MAINTENANCE FOR PV MODULE PV 组件的维护 21 6 1 PANEL VISUAL INSPECTION AND REPLACEMENT 组件外观检 查和替换 21 6 2 CONNECTOR AND CABLE INSPECTION 连接器和线缆检查 22 6 3 CLEANNING ...

Страница 2: ...r reserves the rights to change this User Manual without prior notice Failure of the customer to follow the requirements outlined in this Manual during the installation of the module will result in the invalidity of product s limited warranty 天合光能保留在没有预先通知的情况下变更本安装手册的权利 客户在安装组件过程 中未按照本手册中所列出的要求操作 会导致提供给客户的产品有限质保失效 1 2 LIMITATION OF LIABILITY 责任范围 Trina Solar is not responsible for any form of dama...

Страница 3: ...e module when it is energized or connected with the external power supply 当组件有电流或外部电流出现时 不得连接或断开组件 2 3 HANDLING SAFETY 操作安全 Do NOT stand walk on or step on the module directly 禁止直接在包装或组件上站立 踩踏 行走或跳跃 Do NOT damage or scratch the front or backside surfaces of the module 请不要损坏或划伤组件的上下玻璃面 Do NOT scratch the output cable or bend it with force The insulation of output cable can break and may result in e...

Страница 4: ...ess of unpacking transport and storing should be handled with care 组件在安装前应存储在原包装箱内 请保护好包装不要使其受损 按照建议的拆 包步骤打开组件包装 打开 运输和存储过程需小心操作 Do NOT stand climb walk or jump on unpacked pallets of modules 禁止在未拆包的包装箱上及组件上站立 攀爬 行走或跳跃 Before installation ensure that all modules and electrical contacts are clean and dry 安装前 确保所有组件和电气接触都是干净和干燥的 If the modules are required to be stored temporarily they should be sto...

Страница 5: ...ceeding the maximum number of layers printed on the outer packaging n 2 means no more than two layers and n 3 means no more than three layers 堆叠组件时请勿超过外包装箱上印刷标志 的最高层数限制 n 2 时 最多堆码 2 层 n 3 时 最多堆码 3 层 3 1 8 One module shall be handled by two persons together 一块组件需由 2 个人同时搬运 3 2 UNLOADING WARNNING 卸货注意事项 3 2 1 Use the correct as picture lifting fixture to handle no more than 2 pallets for one time li...

Страница 6: ... 禁止在项目地将组件堆码 3 2 5 Cover the module with waterproof cloth to prevent it from moisture 使用遮雨布盖住组件 防止组件受潮 3 3 SECONDARY TRANSPORT AND WARNNING 二次运输及注意事项 3 3 1 Do NOT remove the original packaging if the modules require long distance transport or long term storage 如果组件需要长途运输或长期存储 请不 要拆除原包装 3 3 2 The finished package can be transported by land sea or air During transport make sure that the package is f...

Страница 7: ...e modules on the back of one person 禁止单人背组件 3 4 STORAGE 存储 Do NOT expose the modules to rain or moisture Store the finished product in a ventilated waterproof and dry place 禁止淋雨或者受潮 请将包装的成品置于通风 防雨和干燥的地方 Do NOT remove the original packaging if the module requires long distance transport or long term storage 如果组件需要长途运输或长期存储 请不要拆除包装 60 cell module and 72 cell modules Stacking no more than 2 layers mo...

Страница 8: ...ring unpacking to avoid hand injury and fingerprints on the glass surface 拆箱过程中请佩戴保护手套 避免伤手和在玻璃面留下指印 Module information and unpacking instructions can be found on the outer package Please read the instructions before unpacking 外包装可查询组件信息和拆包作业指导 请在拆包前详细阅读拆包说明 Each module shall be handled by two persons It is forbidden to pull the wires or junction boxes of the modules to carry the module No pulling...

Страница 9: ...ting material is 10mm higher than the highest point of the module J Box or hook we recommend use the density of EPE 28KG m3 the quantity of duomax to be stacked is 10pcs and the time of stack is 5 days During the stacking process the modules should not bend due to the uneven thickness of the insulating material If this phenomenon occurs it should be adjusted immediately We recommend not to be stac...

Страница 10: ... shock It is recommended to install it immediately after unpacking 安装时请保持连接器干燥清洁 以免触电风险 建议开箱后立即安装 Due to the risk of electrical shock do NOT perform any work if the terminals of PV module are wet Please install immediately after you unpacking 如果PV组件的端子潮湿则不能进行任何工作 以免触电 请在开箱后立即安装 The application level of Trina Solar module is Class A which can be used in systems operating at greater than 50 V DC or ...

Страница 11: ...esign loading 1600Pa with 1 5 times safety factor The modules have been evaluated by TUV according to IEC61215 for a maximum positive design loading of below 1600Pa and negative design loading 1600Pa with 1 5 times safety factor The mechanical load bearing is dependent upon the mounting methods used and failure to follow the instructions of this manual may result in different capabilities to withs...

Страница 12: ...lbf in The tightening step is as follows a Use torque wrench to tighten nut to target torque 16 20N m b Nut loosen 90 180 degrees c Finally tighten the nut to the target torque and reduce the torque attenuation 使用螺栓 平垫圈 弹簧垫圈和螺母在每个固定位置固定组件 并拧紧至16 20 N m 140 180lbf in 的扭矩 拧紧步骤如下 a 使用扭矩扳手拧紧螺母至目标扭矩 16 20N m b 螺母反松90 180 c 最终拧紧螺母至目标扭矩 降低扭矩衰减 All parts in contact with the modules should use flat stainle...

Страница 13: ...uomax serial module with frame 图 4 双玻带框组件系列安装图示 1 aluminum frame 铝边框 2 M8 hex bolt M8 六角螺栓 3 flat stainless washer 平垫片 4 spring stainless washer 弹垫片 5 hex stainless nut 六角螺母 Fig 5 Installation hole 图 5 安装孔示意图 Module 组件 Mechanical Load Pressure 载荷 Safety factor 安全系数 Mounting Direction 安装图 60 pcs Duomax 60片边框双玻 3600 Pa 1600Pa 60 pcs Duomax Twin 60片边框双面双玻 1600Pa 1600 Pa 1 5 1 5 ...

Страница 14: ...螺栓的夹具 Use at minimum 4 clamps to attach modules to the mounting rails 使用至少4个夹具将组件固定在安装导轨上 Be sure to avoid shadowing effects from the module clamps 请务必避免组件夹具的遮光效应 When choosing this type of clamp mounting method use at least four clamps on each module the 4 clamps should be attached on each long sides of the module Depending on local wind and snow loads additional clamps may be required to ensure ...

Страница 15: ...e 组件 Mechanical Load Pressure 载荷 Safety factor 安全系数 Clamp Length 压块长度 Mounting Direction 安装图 60 pcs Duomax 60片双玻 3600 Pa 1600 Pa 1 5 150mm 60 pcs Duomax Twin 60片双面组件 1600 Pa 1600 Pa 1 5 150mm 72 pcs Duomax 72片双玻组件 1600 Pa 1600 Pa 1 5 150mm 3600 Pa 1600 Pa 1 5 150mm 72 pcs Duomax Twin 72片双面组件 1600 Pa 1600 Pa 1 5 150mm ...

Страница 16: ...最大 的允许负载将会减少 由 Trina 进行检查 If the customer needs other size of the Clamp it should be fully evaluated by Trina 如果客户需要其他尺寸的压块 需由天合进行充分评估 STEP 1 Remove the connector parts 取下连接件 Remove the bottom connector parts 取下连接件 STEP 2 Install the clamp 装上压块 Put the clamp bolts into the installation holes and then tighten the nuts keep the distance between two clamps can install the PV modules about 1m between ...

Страница 17: ...应的 国家电气 规程 要求的用作电导体的材料 接地导体必须通过合适的接地电极连接到大 地 Trina Solar modules can be installed with the use of third party listed grounding devices for grounding the metallic frames of PV modules The devices have to be installed in accordance with the grounding device manufacturer s specified instructions 天合光能的太阳能组件可以使用第三方列出的接地装置对PV组件的金属边框进行 接地安装 设备必须按照接地设备制造商的指定说明进行安装 Please refer to the Product Catalogue lin...

Страница 18: ...hen check the string configuration before making the connection 如果一组阵列以相反极性连接到另一个 则会对产品造成无法修复的损坏 在进 行并联之前 请务必确认各列的电压和极性 如果测量发现各列之间的极性相反 或电压差值大于10V 则在进行连接之前检查其结构配置 Trina Solar modules are provided with stranded copper cables with a cross sectional area of 4mm 0 006in which are rated for 1500V DC 90 C and are UV resistant All other cables used to connect the DC system should have a similar or better...

Страница 19: ...he minimum and maximum outer diameters of the cable are 5 to 7mm 0 038 to 0 076in2 电缆的外径范围为5到7mm 0 038 0 076 in2 For field connections use at least 4mm2 copper wires insulated for a minimum of 90 C and sunlight resistance with insulation designated as PV Wire 现场接线应使用最低90 C耐温 耐光且横截面不低于为4mm2的铜线作为PV连 接线 The minimum bending radius cables should be 43mm 1 69in 电缆的最小弯曲半径应为43mm 1 69英寸 5 2 4 WIRING 接线 To ...

Страница 20: ... the array i e if the system is not grounded then fuses should be connected in both the positive and negative poles 在安装熔丝时应将其额定为最大直流电压并连接到阵列的每个非接地极上 换言 之 如果系统没有接地则应将熔丝连接到正负极上 The maximum rating of a fuse connected in series with an array string is typically 20A but the actual module specific rating can be found on the product label and in the product datasheet 与阵列串联连接的熔丝的最大额定值通常为20A 但实际的组件特定额定值可在 ...

Страница 21: ... may shade the solar array thus impacting performance 除去一切可能遮蔽太阳能阵列从而影响其性能的植被 Check that mounting hardware is properly tightened 检查安装的硬件是否紧固到位 Check that all string fuses in each non earthed pole are operating 检查每个非接地极中的所有阵列熔丝是否正常工作 Replacement modules must be of same type Do NOT touch live parts of cables and connectors Use appropriate safety equipment insulated tools insulating gloves etc when h...

Страница 22: ...查阵列的开路电压并验证与其并联连接的其他阵列的开路电压是否在 10V 以内 o Turn the breaker back on 重新合上断路器 6 2 CONNECTOR AND CABLE INSPECTION 连接器和线缆检查 Inspect all cables to verify that connections are tight the cables are protected from direct sunlight and sited away from areas of water collection 检查所有电缆以验证其连接是否牢固 避免电缆受阳光直射且使其远离积水区 域 It is recommended to check the torque of terminal bolts and the general condition of wiring at lea...

Страница 23: ... modules with water which has a similar temperature to the modules being cleaned 清洁组件时 应使用软布和温和的清洁剂以及清水 注意避免出现严重的可能损 坏组件的热冲击 清洁组件时应保证水与组件之间的温差不大 Use dry or wet soft clean cloth to clean the PV modules non corrosive solvents or hard objects are strictly prohibited 应使用干燥或潮湿的柔软洁净的布料擦拭光伏组件 严禁使用腐蚀性溶剂或用硬 物擦拭光伏组件 If there are greasy dirt and other substances on the surface of the PV module which are diff...

Страница 24: ... cracks are on the module surface 组件表面无人为造成的破裂现象 Check to see that whether the module support structure is leaning or bent after cleaning 清洗后组件支架有无倾斜 弯曲现象 Check to see that whether the wiring terminals of the module are detached 组件接线端子是否有脱落的现象等 After cleaning PV modules fill out the PV module cleaning record 光伏组件清洗完后 完成光伏组件清洗文字记录 6 3 2 TROUBLESHOOTING 故障排查 If your installation does not work proper...

Страница 25: ...f must be covered with a layer of fireproof material applicable to this class and adequate ventilation must be ensured between the back sheet and the installation surface A safe working area also must be left between the edge of the roof and the external edge of the solar array 当在屋顶上安装太阳能组件时 屋顶上必须要覆盖有一层适用于该等级的防火材 料 并且保证背面和安装面之间充分的通风 要在屋顶边缘和太阳能阵列的外边 缘之间留出安全的工作区域 In the case of residential installat...

Страница 26: ...蚀试验结果表明 天合光能的 太阳能组件可以安装在近海或亚硫酸盐区域附近的腐蚀性盐碱地区 组件不得浸 泡在水中或长期沾水 纯水或盐水 的环境中 例如喷泉 浪花等 如果组件置于盐 雾 即海洋性环境 或者含硫 即含硫源 火山等 的环境中 会有腐蚀的风险 In locations that are 50m 500mm from the ocean stainless steel or aluminum materials must be used to contact the PV modules and the installation position must be processed with anti corrosion treatment refer to the Trina Solar Coastal Application White Paper for detailed inst...

Страница 27: ...ting or the fire class ratings 应在组件和墙面或屋顶表面之间留有至少115mm 4 5英寸 建议 的间隙 如果采用其他安装方式 则有可能会影响UL认证或防火等级 Attachment 2 INVERTER SELECTION AND COMPATIBILITY 逆变器的选择及其兼容 性 When installed in systems governed by IEC regulations Trina Solar modules normally do not need to be electronically connected to earth and therefore can be operated together with either galvanically isolated with transformer and transformerl...

Страница 28: ...Date June 14th 2019 Doc No PS M 0693 Ver A Page 28 of 29 日期 2019 年 6 月 14 日 文件编号 PS M 0693 发行版本号 A 第28页 共 29 页 变器并确保PV阵列的负直流支路正确接地 ...

Отзывы: