Notice: The contents of this document are proprietary and confidential and the property of Trilliant Holdings, Inc., its susidiaries, affiliates, and/or
licensors. This document is provided subject to the confidentiality obligations set forth in the agreement between your company and Trilliant. The contents
may not be used or disclosed without the express written consent of Trilliant.
32
Installation Guide for SecureMesh® CONN-2000 - PL-0689A
Table 3:
CONN-2000 Part Number and Name
Number
Part Name
1
Breather Vent
2
RJ45 Connector and Gland Nut
3
Power Indicator
4
LAN Active Indicator
5
WAN Active Indicator
6
RSSI Indicator
7
Reset Push Button
Configuration and Startup
When the CONN-2000 receives power, the power-on sequence starts automatically.
The Status, LAN, WAN, and RSSI LEDs indicate the progress through the sequence.
For details on how to automatically provision and then start the device, see the Admin-
istrator Guide for SecureMesh WAN and NEMS.
See
for the four LED functions and explanations.
Applying Power through the PoE Injector
Figure 2 shows a typical cabling setup for the CONN-2000. When AC power gets
applied to the PoE injector, it delivers power to the CONN-2000.
In order to complete the power-up sequence and link to the wireless network, the
device must have access to the signal from a Gateway, Extender, or Extender Bridge.
The power-on sequence can take up to 30 seconds, depending on how quickly the
device acquires the signal and links to the parent device.
Содержание SecureMesh CONN-2000
Страница 2: ......
Страница 5: ...Index 52...