![TrickleStar Optimizing Energy TS2104 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/tricklestar/optimizing-energy-ts2104/optimizing-energy-ts2104_installation-manual_1162046011.webp)
11
Step 3: Open your HVAC system’s cover
Open your HVAC system’s cover to reveal the control board.
We recommend that you take a photo of the wires connected to the HVAC control board. You may need
to refer to this photo at a later stage.
Y
W
G
C
R
HVAC control board
Note:
The HVAC system contains high voltage circuitry and wires. Before you open your HVAC
system’s cover, be sure to check that you have turned off the power for your HVAC system.
Fig 11-A