10 

 

4.1

 

Lifting tanks up to 4.6m long 

 

 

 Tanks up to 4.6m in length should be lifted using the eyebolts on the tank. 

 

 Tanks over 4.6m in length can be lifted using only lifting straps, as shown in Option 1. However, on 
sites where lifting height is restricted, a lifting bar should be used as shown in Option 2: 
 

 

 

 

To ensure the angle of the sling is not greater than 60

o

, as per option 1 above, the following sling 

lengths are required: 

 

Length of tank 

Minimum length of sling 

1.6 

1.6 

2.6 

2.6 

5

 

Installation 

5.1

 

Installation Planning 

Important

 

Prior to the installation of the Tricel Pumping Chamber, it is important to carefully read these installation 
instructions.

 

 

 

 

When planning the installation of a Tricel Pumping Chamber, the following must be considered:

 

Backfill Considerations: 

 

o

 

Is this a dry or wet site i.e. presence of a water table?

 

o

 

Which backfill material is appropriate for this

 

site?

 

o

 

What is the finished ground level and will risers be required? 
Note: 

If a riser is required, the installation may require a concrete backfill. If unsure of the 
finished ground level, always use a concrete backfill as risers greater than 250mm 
cannot be retrofitted without a concrete backfill. 

 
 
 
 

Содержание Pumping Chamber 2600

Страница 1: ...1 701 Rev 3 November 2019 TricelDomestic LightCommercial PumpingChambers Wastewater Treatment Plants Engineering a green future...

Страница 2: ...allation 11 5 5 Installation Procedure 12 5 5 1 Excavation Dry Wet Sites 12 5 5 2 Installation Step by Step Guide 13 5 6 Gravel Specification 14 5 7 Concrete Specification 15 5 8 Topsoil Requirements...

Страница 3: ...enance 29 9 1 Regular Maintenance 29 9 2 Annual Maintenance 29 9 3 Annual Service Availablefromyoursupplier 29 9 4 De sludging Emptying the solid waste from the pumpingchamber 30 10 Operating Conditio...

Страница 4: ...orsmoking Allaccess hatches must belockedforsafety Tanksaresuppliedwith3lockingpoints asshown below All these points should be locked with a suitable locking device to prevent unauthorised access Lock...

Страница 5: ...le The Tricel Pumping Chamber comes with a Tricel 75 pump as standard for treated effluent and a GRI11 for raw sewage The GRI 11 pump is also available if greater distances or a higher head is require...

Страница 6: ...l width m 1 64 1 64 Overall height m 2 56 2 56 Inlet invert to base m 1 375 1 375 Outlet invert to base m 1 67 1 67 Inlet invert to ground level m 0 535 0 535 Outlet invert to ground level m 0 250 0 2...

Страница 7: ...7...

Страница 8: ...plied with a backup pump in case of pump failure In this case the two pumps would alternate by means of a flip flop control panel to prolong the lifespan of the pumps These systems are fitted with non...

Страница 9: ...agorroll Always set the tank s on flat smooth ground clear of debris etc To prevent movement tanks may need to be tied down and chocked Position the chocks in the locations shown below Tanksarebestlif...

Страница 10: ...1 Installation Planning Important Prior to the installation of the Tricel Pumping Chamber it is important to carefully read these installation instructions When planning the installation of a Tricel...

Страница 11: ...ay as practically possible considering topography and pipe work levels The Tricel Pumping Chamber should not be installed in an area subject to flooding or excessive water runoff as no flood waters sh...

Страница 12: ...Gravel Dry 250mm Gravel Dry 500mm 750mm Concrete Wet None Concrete Wet 250mm 500mm 750mm Concrete Important Incorrectly installed tanks that are subject to movement rotation or floatation may become d...

Страница 13: ...ired Gravel Concrete Installation of the tank base plinth 1 Remove any soft spots or large stones and boulders 2 The base is constructed of a 250mm layer of suitably compacted gravel The base is const...

Страница 14: ...backfill is considered good installation practice The fabric must be chosen to allow the flow of water in and out of the excavation but to prevent the movement of fine soil particles into the gravel b...

Страница 15: ...n Semi dry concrete 25n grade with a ratio of 4 5 aggregate to 1 cement Important Standard concrete mixes should not be used where sulphates or similarly aggressive chemicals are present in the ground...

Страница 16: ...vailable in the following sizes 250mm requires installationsuitablefor the site conditions 500mm requires a concrete backfill 750mm requires a concrete backfill 500mm and 750mm risers cannot be retrof...

Страница 17: ...as close to the bolted joints as possible The reinforced concrete slab Deadman anchor must be installed after the level of the ground water has been lowered if necessary Once the TricelPumping Chambe...

Страница 18: ...d requirements Electrical installations must be carried out by a qualified and certified electrician A wiring label is located on the inside of the alarm box The customers minimum responsibility shall...

Страница 19: ...19 5 11 1 Wiring Procedure Wire the float into the alarm panel First crimp the brown and black cores Put the brown into the second live terminal and the black into terminal L See Figures below...

Страница 20: ...20...

Страница 21: ...ac compression fitting on the tank The inlet to the pumping chamber will be a 4 inch pipe socket A 4 inch sewer pipe is plumbed from the house to the tank with a fall to the tank so sewage will flow i...

Страница 22: ...icel 75 Tricel 75 is the basic pump which is used to pump wastewater over a short distance with a low head The Tricel 75 is capable of handling solids of up to 35mm in diameter To operate correctly ma...

Страница 23: ...23 6 1 1 Operating Performance Tricel 75...

Страница 24: ...24...

Страница 25: ...RI 11 is able to macerate all the solids present in the sewerage into small pieces To operate correctly make sure the on off float of the pump can move freely and that it is not snagging against the d...

Страница 26: ...26 6 2 1 Operating Performance GRI 11...

Страница 27: ...ll with sewerage thus raising the high level float which activates a beeping alarm and red light If the alarm is activated the home owner should contact Tricel to send out a technician with a replacem...

Страница 28: ...umbing and the electrical connection are complete the Tricel Pumping Chamber is now operational The plant should be already filled with water during installation before its first use If the plant is r...

Страница 29: ...t of maintenance is required on an on going basis to ensure that the pumping chamber is working correctly This is the responsibility of the customer 9 1 Regular Maintenance All vents should be checked...

Страница 30: ...he failure of any plumbing equipment or failure caused by the inclusionof prohibited material in the pumping chamber The manufacturer s installation operation and maintenance instructions outlined in...

Страница 31: ...Pumping Chamber capacity and retention times Similarly if Tricel size the Tricel Pumping Chamber and a greater load is placed on the Tricel Pumping Chamber by the addition of extra houses bedrooms sc...

Страница 32: ...checked by a qualified person Pump operates but delivers no water Low line voltage or wired incorrectly An electrician should check the power supply to the pump Blockage in impeller Clean out impeller...

Страница 33: ...s Pipe work is damaged or blocked or fitted incorrectly Inspect pipe work to ensure it is undamaged and clear of obstructions or sagging Bad effluent odour directly over the tank Pipe work to or from...

Страница 34: ...erms Conditions Subject to our standard terms and conditions which are available on request Inaccordancewithournormalpolicyofproductdevelopment thisspecificationis subjecttochangewithout notice Novemb...

Страница 35: ...35 Notes...

Страница 36: ...A trading brand of Dewey Waters Ltd Heritage Works Winterstoke Road Weston super Mare BS24 9AN United Kingdom Tel 44 0 1934 422 311 I Email environment tricel co uk I www tricel co uk In accordance wi...

Отзывы: