background image

 

21 

 

9

 

Operating Conditions 

Warning 

Before installing/operating the Tricel Puraflo system, please read this manual in its entirety, paying 
special attention to the section entitled ‘Health and Safety Precautions’. Normal health and safety 
precautions should be adhered to at all times, as well as the appropriate procedures to avoid the 
occurrence of accidents. 

 

The manufacturer’s installation, operation and maintenance instructions outlined in this manual 
must be followed at all times to ensure the system operates as designed. Any variations to these 
guidelines could result in the unit not performing to its full potential and the discharge may not 
meet the required standards. The property owner has a legal responsibility to ensure that the 
system does not cause pollution, a health hazard or nuisance. 

9.1

 

Conditions: 

 

De-sludging is a critical part of the successful operation of the Tricel Puraflo system and is 
the responsibility of the customer. Only competent and approved personnel should carry 
out  de-sludging. De- sludging must be carried out when required as  specified, and the 
system should by inspected regularly to check the depth of sludge in the primary chamber. 
If de-sludging is required it should be done as soon as possible. 

 

An electrical connection to the plant must be maintained for it to function correctly. This 
ensures that the plant has a continuous air supply and where necessary the discharge pump will 
operate. 

 

The Tricel Puraflo system  is one part of the overall wastewater treatment system, which 
includes many components (plumbing, ventilation, plant and polishing filter). Each 
component has to function correctly for the overall system to work which is the 
responsibility of the homeowner 

 

If the plant is not installed correctly, flooding, overloading, electrical shock or floatation 
may occur. We are not responsible for incorrectly installed plants. 

 

Soakaways, drains and the emptying of primary chamber remains the responsibility of the 
client. Damage to the installation due to the influx of surface water or the backing up of soak 
ways or drains is not covered by the manufacturer. 

 

To ensure the continuance of the  Tricel Puraflo system’s performance the user has to take 
certain precautions including the following: 

o

 

The design loading of the system should not be exceeded. 

o

 

High volume discharges, such as those from swimming pools and Jacuzzis must never 

enter the system. 

o

 

Surface water must not enter the system. 

o

 

Do not allow large quantities of chemicals to enter the system, including but not 

limited to: 

 

Detergent 

 

Water softener 

 

Disinfectants 

 

Strong acids and alkalis, or photographic chemicals 

 

Oil or grease 

Содержание 11P Puraflo Secondary

Страница 1: ...1 125 Rev 4 Jan 2019 Tricel Puraflo 1 50 Wastewater Treatment Plants Engineering a green future...

Страница 2: ...eatment 11 3 Tricel Puraflo Range 12 3 1 System Specifications 12 3 2 System Components 12 3 2 1 Tricel Puraflo Module 12 3 2 2 Effluent Filter secondary treatment only 13 3 2 3 Pump 13 3 2 4 Pipework...

Страница 3: ...Conditions 21 10 Troubleshooting 23 10 1 Plant Operation 23 10 2 Odours 24 11 Certification 25 11 1 Declaration of Performance Tricel Puraflo with Tricel Fortis 25 11 2 Declaration of Performance Tric...

Страница 4: ...4...

Страница 5: ...5...

Страница 6: ...e wastewater treatment system must be appropriately trained Suitable protective clothing including waterproof abrasion resistantgloves overalls safety footwear eye ear and respiratory protection goggl...

Страница 7: ...hende sludgingand thereforethisshallneverbe donealone A wastewater treatment system that fails to fully treat sewage due to poor maintenance or overloading may allow excess nutrients phosphorus and ni...

Страница 8: ...using little to no energy The Tricel Puraflo system works in conjunction with your septic tank or wastewater treatment plant The wastewater is distributed evenly over the top of the peat filter using...

Страница 9: ...evenly onto the peat filter via a distribution grid at the top of each Puraflo module Stage 3 Liquid effluent undergoes treatment as it filters through the bio fibrous peat in the Puraflo modules Stag...

Страница 10: ...er of modules depend on loadings 7 Sampling Chamber 8 DistributionBox Flowing topercolationarea pumpchambertodischarge treated liquid Some septic tanks may only have one manhole cover 2 2 2 Plan view...

Страница 11: ...tank a pumping chamber with control alarm kiosk as well as the Puraflo modules with a sampling chamber 2 3 2 Tertiary Treatment Environmentally sensitive sites or sites that are restricted in terms o...

Страница 12: ...2 7 9 1 3 3 10 11 1 4 4 12 15 3 2 6 16 21 4 2 8 22 24 3 3 9 25 27 5 2 10 28 33 6 2 12 34 42 5 3 15 43 45 4 4 16 46 50 6 3 18 3 2 System Components 3 2 1 Tricel Puraflo Module Dimension Unit Value A m...

Страница 13: ...hose over the septic tank 3 2 3 Pump The submersible pump and float switch is fitted with a thermal overload protection Effluent from the septic tank or waste water treatment is pumped via a 1 5inch p...

Страница 14: ...ted wastewater from the Puraflo modules and the pipeworkusedforthedispersion of wastewater on top of the peat inside the Puraflo modules is in accordancewithBS3505 1986 Specification for unplasticized...

Страница 15: ...15 Important If you required drawings for larger Tricel Puraflo systems from 12 to 50PE please visit http ie tricel eu downloads...

Страница 16: ...re ropes in contact with the modules Care is needed to control the lift to ensure the modules are not damaged The modules are designed for a single lift when placing them in position Always lift modul...

Страница 17: ...result in reduced effectiveness and increased maintenance and orreplacementcostsinthelong term 8 1 Regular Maintenance 8 1 1 Septic Tank If applicable Theseptictankshouldbede sludgedwhenrequired Inacc...

Страница 18: ...lter over the septic tank ensuring that all solids fall back into the septic tank Insert the filter cartridge back into the housing ensuring that the filter is properly aligned and inserted correctly...

Страница 19: ...relation to the pump o Intheeventofanelectricalstormorpowerfailure thecircuit breakerswitchesoff theelectrical linesfeedingthepump The pump alarmshouldbecheckedtoseeif they tripped to the off positio...

Страница 20: ...the septic tank primary storage chamber is measured The system is inspected for any obvious non wastewater infiltration into any compartment at the time of inspection The effluent filter in the septi...

Страница 21: ...e done as soon as possible An electrical connection to the plant must be maintained for it to function correctly This ensures that theplanthasacontinuousairsupplyandwherenecessarythedischargepumpwill...

Страница 22: ...meticandcleaningwipes Sanitarytowels Tampons Kitchenpaper Nappies Medication Servicepersonnelmustbeaccommodatedwithclearaccesstothesystem If others size the system we will supply to these specificatio...

Страница 23: ...move freely Storm water flooding Redirect storm water drains Storm water must never enter the plant Discharge hose pipe blocked Find blockage and remove or replace damaged hose pipe Pump runs intermi...

Страница 24: ...in the drains are fitted and the joints sealed Air vent on pipe work not installed correctly Ensure all effluent pipes are vented correctly Vents are normally fitted to all pipes and they should be h...

Страница 25: ...RP Technology Septic tank with bio fibrous peat filter Components Septic tank Pump chamber bio fibrous peat modules alarm 4 Intended for Use To treat domestic wastewater for up to 50 population equiva...

Страница 26: ...ad of 0 33kg d and hydraulic daily load of 0 9m 3 d Determined at temperatures 12 0 Material Performance Essential Characteristics Method Performance Harmonised Technical Specification Water Tightness...

Страница 27: ...r finstitut f r Abwassertechnik GmbH Hergenrather Weg 30 52074 Aachen Number NB 1739 Treatment design capacity Nominal organic daily load BOD5 Nominal Hydraulic daily flow QN As Set Out in Table CE fo...

Страница 28: ...s peat modules alarm 4 Intended for Use To treat domestic wastewater for up to 50 population equivalent 5 Name Address and Contact Information of Manufacturer Tricel Killarney Unlimited Company tradin...

Страница 29: ...s obtained at average organic daily load of 0 33kg d and hydraulic daily load of 0 9m 3 d Determined at temperatures 12 0 Material Performance Essential Characteristics Method Performance Harmonised T...

Страница 30: ...rance Number NB 1164 Puraflo Notified Body Pr finstitut f r Abwassertechnik GmbH PIA Hergenrather Weg 30 52074 Aachen Germany Number NB 1739 Treatment design capacity Nominal organic daily load BOD5 N...

Страница 31: ...31...

Страница 32: ...Puraflo Tertiary 221361 1 62 4050 33P Puraflo Secondary 221349 1 98 4950 33P Puraflo Tertiary 221362 1 98 4950 42P Puraflo Secondary 221350 2 52 6300 42P Puraflo Tertiary 221363 2 52 6300 45P Puraflo...

Отзывы: