background image

 

 

 

 

125 Rev 4 Jan 2019 

Tricel

®

 Puraflo 1-50 

 

Wastewater Treatment Plants 

 

 

Engineering a green future

 

 

 

Содержание 11P Puraflo Secondary

Страница 1: ...1 125 Rev 4 Jan 2019 Tricel Puraflo 1 50 Wastewater Treatment Plants Engineering a green future...

Страница 2: ...eatment 11 3 Tricel Puraflo Range 12 3 1 System Specifications 12 3 2 System Components 12 3 2 1 Tricel Puraflo Module 12 3 2 2 Effluent Filter secondary treatment only 13 3 2 3 Pump 13 3 2 4 Pipework...

Страница 3: ...Conditions 21 10 Troubleshooting 23 10 1 Plant Operation 23 10 2 Odours 24 11 Certification 25 11 1 Declaration of Performance Tricel Puraflo with Tricel Fortis 25 11 2 Declaration of Performance Tric...

Страница 4: ...4...

Страница 5: ...5...

Страница 6: ...e wastewater treatment system must be appropriately trained Suitable protective clothing including waterproof abrasion resistantgloves overalls safety footwear eye ear and respiratory protection goggl...

Страница 7: ...hende sludgingand thereforethisshallneverbe donealone A wastewater treatment system that fails to fully treat sewage due to poor maintenance or overloading may allow excess nutrients phosphorus and ni...

Страница 8: ...using little to no energy The Tricel Puraflo system works in conjunction with your septic tank or wastewater treatment plant The wastewater is distributed evenly over the top of the peat filter using...

Страница 9: ...evenly onto the peat filter via a distribution grid at the top of each Puraflo module Stage 3 Liquid effluent undergoes treatment as it filters through the bio fibrous peat in the Puraflo modules Stag...

Страница 10: ...er of modules depend on loadings 7 Sampling Chamber 8 DistributionBox Flowing topercolationarea pumpchambertodischarge treated liquid Some septic tanks may only have one manhole cover 2 2 2 Plan view...

Страница 11: ...tank a pumping chamber with control alarm kiosk as well as the Puraflo modules with a sampling chamber 2 3 2 Tertiary Treatment Environmentally sensitive sites or sites that are restricted in terms o...

Страница 12: ...2 7 9 1 3 3 10 11 1 4 4 12 15 3 2 6 16 21 4 2 8 22 24 3 3 9 25 27 5 2 10 28 33 6 2 12 34 42 5 3 15 43 45 4 4 16 46 50 6 3 18 3 2 System Components 3 2 1 Tricel Puraflo Module Dimension Unit Value A m...

Страница 13: ...hose over the septic tank 3 2 3 Pump The submersible pump and float switch is fitted with a thermal overload protection Effluent from the septic tank or waste water treatment is pumped via a 1 5inch p...

Страница 14: ...ted wastewater from the Puraflo modules and the pipeworkusedforthedispersion of wastewater on top of the peat inside the Puraflo modules is in accordancewithBS3505 1986 Specification for unplasticized...

Страница 15: ...15 Important If you required drawings for larger Tricel Puraflo systems from 12 to 50PE please visit http ie tricel eu downloads...

Страница 16: ...re ropes in contact with the modules Care is needed to control the lift to ensure the modules are not damaged The modules are designed for a single lift when placing them in position Always lift modul...

Страница 17: ...result in reduced effectiveness and increased maintenance and orreplacementcostsinthelong term 8 1 Regular Maintenance 8 1 1 Septic Tank If applicable Theseptictankshouldbede sludgedwhenrequired Inacc...

Страница 18: ...lter over the septic tank ensuring that all solids fall back into the septic tank Insert the filter cartridge back into the housing ensuring that the filter is properly aligned and inserted correctly...

Страница 19: ...relation to the pump o Intheeventofanelectricalstormorpowerfailure thecircuit breakerswitchesoff theelectrical linesfeedingthepump The pump alarmshouldbecheckedtoseeif they tripped to the off positio...

Страница 20: ...the septic tank primary storage chamber is measured The system is inspected for any obvious non wastewater infiltration into any compartment at the time of inspection The effluent filter in the septi...

Страница 21: ...e done as soon as possible An electrical connection to the plant must be maintained for it to function correctly This ensures that theplanthasacontinuousairsupplyandwherenecessarythedischargepumpwill...

Страница 22: ...meticandcleaningwipes Sanitarytowels Tampons Kitchenpaper Nappies Medication Servicepersonnelmustbeaccommodatedwithclearaccesstothesystem If others size the system we will supply to these specificatio...

Страница 23: ...move freely Storm water flooding Redirect storm water drains Storm water must never enter the plant Discharge hose pipe blocked Find blockage and remove or replace damaged hose pipe Pump runs intermi...

Страница 24: ...in the drains are fitted and the joints sealed Air vent on pipe work not installed correctly Ensure all effluent pipes are vented correctly Vents are normally fitted to all pipes and they should be h...

Страница 25: ...RP Technology Septic tank with bio fibrous peat filter Components Septic tank Pump chamber bio fibrous peat modules alarm 4 Intended for Use To treat domestic wastewater for up to 50 population equiva...

Страница 26: ...ad of 0 33kg d and hydraulic daily load of 0 9m 3 d Determined at temperatures 12 0 Material Performance Essential Characteristics Method Performance Harmonised Technical Specification Water Tightness...

Страница 27: ...r finstitut f r Abwassertechnik GmbH Hergenrather Weg 30 52074 Aachen Number NB 1739 Treatment design capacity Nominal organic daily load BOD5 Nominal Hydraulic daily flow QN As Set Out in Table CE fo...

Страница 28: ...s peat modules alarm 4 Intended for Use To treat domestic wastewater for up to 50 population equivalent 5 Name Address and Contact Information of Manufacturer Tricel Killarney Unlimited Company tradin...

Страница 29: ...s obtained at average organic daily load of 0 33kg d and hydraulic daily load of 0 9m 3 d Determined at temperatures 12 0 Material Performance Essential Characteristics Method Performance Harmonised T...

Страница 30: ...rance Number NB 1164 Puraflo Notified Body Pr finstitut f r Abwassertechnik GmbH PIA Hergenrather Weg 30 52074 Aachen Germany Number NB 1739 Treatment design capacity Nominal organic daily load BOD5 N...

Страница 31: ...31...

Страница 32: ...Puraflo Tertiary 221361 1 62 4050 33P Puraflo Secondary 221349 1 98 4950 33P Puraflo Tertiary 221362 1 98 4950 42P Puraflo Secondary 221350 2 52 6300 42P Puraflo Tertiary 221363 2 52 6300 45P Puraflo...

Отзывы: