background image

1

TREX REVEAL

®

 POST

Installation Instructions for Pressure Treated Wood Framing

LOCATION AND INSTALLATION OF POSTS 

TREX REVEAL

IMPORTANT NOTES:

»  EACH POST MUST BE ATTACHED PER DETAILED 

DESCRIPTIONS LISTED BELOW TO ENSURE A CODE 
COMPLIANT AND SAFE INSTALLATION.

»  ALWAYS REFER TO YOUR LOCAL BUILDING CODE OFFICIAL PRIOR TO 

INSTALLING ANY RAILING SYSTEM TO ENSURE ALL CODE AND SAFETY 

REQUIREMENTS ARE MET. TREX CANNOT BE HELD RESPONSIBLE FOR 

IMPROPER OR NON-RECOMMENDED INSTALLATIONS.

»  WHEN INSTALLING REVEAL POSTS ON ACQ OR CCA SURFACES, 

USE AN APPROPRIATE ISOLATION BARRIER BETWEEN POST AND 

SURFACE (CONTACT LOCAL BUILDING CODE OFFICIAL IF REQUIRED).

»   FOR INSTALLING STANDARD REVEAL POST AND/OR REVEAL 

CROSSOVER POSTS, SEE BELOW.

»   FOR PRESSURE TREATED POSTS, POST SLEEVES, AND SKIRTS, SEE 

DETAILED INSTRUCTIONS PROVIDED WITH REVEAL RAILING KITS.

»   ALL REVEAL STAIR INSTALLATIONS REQUIRE THE USE OF 53" STAIR 

POST, MEASURED AND CUT TO APPROPRIATE LENGTH IF NECESSARY.

»   IF CROSSOVER STAIR POST IS REQUIRED, USE STAIR POST (AGAIN 

CUT TO APPROPRIATE LENGTH IF NECESSARY) AND USE SWIVEL 
CROSSOVER BRACKET.

 

TOOLS AND MATERIALS NEEDED

»   Drill and/or screw gun
»    1/2" (1.27 cm)

 

drill bit for wood

»     Blocking - 2" x 8" (5.1 cm x 20.3 cm) pressure treated Southern Yellow Pine 

or equivalent

»    Qty 36 (per post) - 3" pressure treated compatible wood screws

CODE APPROVED POST APPLICATIONS

Post size

2"

2"

2x2 Post

2.5"

2.5"

2.5x2.5 Post (IRC)

< 30" height 
decking

Approved

Approved

IRC Approved

Not Approved 

Approved

IBC Approved Not Approved

Not Approved

RAILING CONFIGURATIONS

 

Corner Post Installation 

1.  Install 2" x 8" (5.1 cm x 20.3 cm) cross bracing frame 

in between joists at 7 1/4" (18.4 cm). Attach a total 
of twelve 3" (7.6 cm) pressure treated compatible 
screws (not provided) as shown in figure 1.

2.  Install two 2" x 8" (5.1 cm x 20.3 cm) boards as 

blocking under post location. Securely attach 
blocking using a total of twenty-four 3" (7.6 cm)  
pressure treated compatible screws (not provided) as 
shown in figure 2.

Line Post Installation 

3.  Install two 2" x 8" (5.1 cm x 20.3 cm) cross bracing 

frames in between joists at 7 1/4" (18.4 cm). Attach a 
total of twelve 3" (7.6 cm) pressure treated compatible 
screws (not provided) as shown in figure 3.

7-1/4

"

(18.4 cm)

7-1/4

"

(18.4 cm)

2" x 8" Pressure Treated 

Cross Bracing board

1

2

Blocking

boards

7-1/4

"

(18.4 cm)

7-1/4

"

(18.4 cm)

3

Cross Bracing 

frame

Cross Bracing 

frame

TR-REVEAL-0813

NOTE:

 

Construction methods are always improving. Please ensure you 

have the most up-to-date installation instructions by visiting: 

trex.com

Have Questions?

1–800–BUY–TREX

Отзывы: