
3
4
. Connect a network source to the switch and connect other PoE or non-PoE
network devices to the switch. Check the LEDs to confirm the connections
are established. Your installation is completed.
Ÿ
Turn off the power before connecting any module or wire. The correct power
supply voltage is listed on the product label. Check the voltage of your
power source to make sure that you are using the correct part. Do NOT use
voltage greater than what is specified on the product label.
Ÿ
Calculate the maximum possible current in each power wire and common
wire. Observe all electrical codes dictating the maximum current allowable
for each wire size. If the current surpasses the maximum ratings, the wiring
could overheat, causing serious damage to your equipment.
3
. Connect the power source (sold separately) to the switch. Connect the
TRENDnet 48DC3000 power adapter to the DC-jack or connect a
compatible third party DIN-rail power source to the power terminal block.
Safety Note
!
Top View
PWR
RPS
ALM
Front View
PoE+
1000 Mbps
(Green)
Link/Act
(Green)
Link/Act
(Green)
SFP
(1000Mbps)
SFP
DIP Switches
Power Input
DC-Jack
Power Input
Terminal Block
Grounding
Screw