![Trend Sports Heater Sinker SC299 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/trend-sports/heater-sinker-sc299/heater-sinker-sc299_instructions-manual_1155787006.webp)
Pre-Operating Instructions
Pre-Operation #1
Locate Allen Wrench (provided in package) and unscrew (3) three
wheel cover screws.
Pre-Operation #2
Tire pressure should be between 40 - 45 lbs. psi. If tire pressure reads
low, use an air pump to inflate the tire to 40 - 45 lbs. psi. If tire pressure
reads high, decrease the air pressure by pushing down the air stem
bubble located in the middle of the air stem. ••Inspect the air pressure
periodically to make sure air pressure is still within the 40 - 45 lbs. psi
range.••
Check The Air Pressure In The Heater Sinker Pitching Machine Tire.
Warning: Make sure Heater Sinker Pitching Machine is unplugged and
the tire is not spinning during these operations.
Pre-Operation #3
Locate Allen Wrench (provided in package) and secure Wheel Cover back
on machine by tightening (3) three Wheel Cover Screws.
Warning - Serious Bodily Injury: Never operate Heater Sinker Pitching
Machine until Wheel Cover is secured with the (3) three Wheel Cover
Screws.
Check Heater Sinker Fuse Reset Button
Fuse Re-Set Button
The Heater Sinker Pitching Machine has a fuse reset button which is
designed to protect the electronic circuit in the Heater Sinker Pitching
Machine. If the Heater Sinker will not turn on, check this button to
make sure it is not popped out. If it is popped out, press it back in to
reset the fuse circuit breaker. This should allow the Heater Sinker to
operate properly.
Important:
Periodically inspect the tire to make sure it is not worn out, flat,
or punctured. Serious damage could result if operated in any of
these conditions.