
10
N
L
220V~
_WIRING
The Treesse hot tubs are built in compliance with European (EN 60 335-2-60) laws and are tested during
manufacturing to ensure safety of both the installer and the user.
The connection must be made by a qualified electrician.
All electrical connections must be performed after having disconnected the power supply of the
building.
Wiring must be:
performed in a
fixed and permanent manner
, without any intermediate connections, in accordance
with the regulations in force the Country of installation.
•
suitable for the current consumption of the hot tub (see technical specifications);
provided with an effective and compliant grounding system
•
protected against water splashes, hence sheltered in a dedicated place, closed and protected against
atmospheric agents;
controlled by an omnipolar switch with contact gap of at least 3 mm and a switching capacity of 60A (or
otherwise suitable to the consumption of the tub);
controlled by a differential switch not exceeding 30mA.
The Manufacturer denies all liability for connections that are not compliant with the regulations,
as specified in this manual or in the event of tampering with any electrical component of the tub.
wiring box, where to
connect the tub electrical
system to the mains
Once you have
made the
connections, check
the correct
operation of the
differential
switch, pushing the
TEST key, which
should trip.
Содержание Dream 160
Страница 1: ...DREAM Bathtubs INSTALLATION USE AND MAINTENANCE MANUAL 02_2018...
Страница 19: ...19 NOTES...