PARTS NEEDED
251-H- 15’ Yellow Rope-
(2)
251-17- 22” Rope Ladder Rung-
(5)
251-C- Swingbeam Tri-Plate-
(1)
HARDWARE NEEDED
SB-3- 1/2” x 3” Carriage Bolt-
(2)
SB-18- 3/4” USS Flatwasher-
(2)
SB-17- 1/2” USS Flatwasher-
(2)
SB-15- 1/2” Split Lockwasher-
(2)
SB-7- 1/2” Hex Nut-
(2)
SB-2- 1/2” Acorn Nut Plated-
(2)
Main Assembly
Slide one end of rope through the Upper Rope Arm and tie a good
knot. Then take a 251-17 and slide it up about a 1 to 1 1/2 ft below
the Rope Arm and tie knot holding it. Repeat for all 251-17’s and tie a
knot on the Rope Runner.
25
1-H
251
-17
SB-3
SB-1
8
251-C
SB-17
SB-1
5
SB-7
SB-2
Содержание Toucan Playcenter
Страница 1: ......
Страница 14: ...Picture Description QTY CC 247 251 43 119 Swingbeam 1...
Страница 16: ...Picture Description QTY 558 8 58 3 4 Wood Roof Support 4...
Страница 51: ......
Страница 57: ......