PG. 55
PARTS NEEDED
RFA-8- Disc Swing-
(1)
RFA-11- 14’ Yellow Rope-
(1)
Rainforest Cottage Swingbeam Install
Slip the rop throught the Swingbeam and tie a knot.. Then tie a know every 3 to
4 feet until you place the RFA-8 on the rope and tie a double knot keeping it in
place.
RF
A-1
1
RF
A-8
HARDWARE NEEDED
Hardware with Ships Wheel-
(1)
RFH-12- 1/4” USS Flatwasher-
(4)
RFH-15- #14 x 1” Pan Phillips T/S-
(4)
Slide
Using a 7/16” Drill Bit, Drill throught the slide and deck. Then attach as shown.
SH-2
SH-1
SH-3
Содержание Rainforest Cottage
Страница 18: ...RFC 61 52 3 16 R Wood Roof Board Trapeze QTY 8 Rainforest Cottage Base Lumber...
Страница 90: ...PG 56...