Pg. 25
HARDWARE NEEDED
TH-2- 1/4” x 4 1/2” Hex Lag Screw-
(4)
TH-3- 1/4” USS Flatwasher-
(4)
TH-1- 2 1/2” Coated Deck Screw-
(4)
PARTS NEEDED
PFB-9- End Tarp Board-
(2)
PFB-8- Center Tarp Board-
(1)
Parrot Island Fort- Tarp Install
(For Wood Roof Skip)
PFB-9
PFB-9
PFB-8
TH-3
TH-2
TH-1