
PAGE 20
MAGNUM 610R PUMP OPERATION / MAINTENANCE MANUAL
4.9 TESTING
4.9.a Performance Test
With the air supply at 0 psi open the air supply valve
Increase the air pressure until the pump starts to cycle
Record the start pressure, Target = <20psig
Pump must prime once even cycling is achieved
Increase pressure to 60 psi
Check for fluid leaks, listen for air leaks, check for irregularity
Prepare the pump for drying
4.9.b Dry Pump
Connect vacuum hose to discharge line
Connect purge line to fluid inlet
60 psig Supply Pressure
Cycle pump & vacuum dry by rotating pump side to side for 30 seconds.
Turn off Air Supply and allow the pump to purge for 5 minutes.
4.9.c Dry Suction
20 psig Supply Pressure Target
Record Suction Value
Target = 8 in-Hg.