Travis Industries Revolution 36CF Скачать руководство пользователя страница 9

Installation

  

(for qualified installers only)

9

© Travis Industries

4060623

100-01170

Massachusetts  Requirements

N O T E

   : The following requirements reference various Massachusetts and national codes not contained in this document.

Requirements for the Commonwealth of Massachusetts

For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in
part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent
termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and
porches, the following requirements shall be satisfied:

Installation of Carbon Monoxide Detectors

At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall
observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the
gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard
wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served
by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the
services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.
In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired
carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.
In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall
have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day
period, a battery operated carbon monoxide detector with an alarm shall be installed.

Approved Carbon Monoxide Detectors

Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be
ANSI/UL 2034 listed and IAS certified.

Signage

A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight
(8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or
equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, “GAS VENT DIRECTLY BELOW. KEEP
CLEAR OF ALL OBSTRUCTIONS”.

Inspection

The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation
unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the
provisions of 248 CMR 5.08(2)(a)1 through 4.

Exemptions

The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:
• The equipment listed in Chapter 10 entitled “Equipment Not Required To Be Vented” in the most current edition of NFPA 54 as
adopted by the Board; and
• Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the
dwelling, building or structure used in whole or in part for residential purposes.

MANUFACTURER REQUIREMENTS

Gas Equipment Venting System Provided

When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or
venting system components with the equipment, the instructions provided by the manufacturer for installation of the
equipment and the venting system shall include:
-- Detailed instructions for the installation of the venting system design or the venting system components; and
-- A complete parts list for the venting system design or venting system.

Gas Equipment Venting System NOT Provided

When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts
for venting the flue gases, but identifies “special venting systems”, the following requirements shall be satisfied by the
manufacturer:
-- The referenced “special venting system” instructions shall be included with the appliance or equipment installation
instructions; and
-- The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include a
parts list and detailed installation instructions.
A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting
instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or
equipment at the completion of the installation.

See “

Gas Line Requirements

” on page16 for additional Massachusetts requirements.

Содержание Revolution 36CF

Страница 1: ...ely call gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must be performed by a qual...

Страница 2: ...g Details This appliance was listed by OMNI Test Labs to ANSI Z21 88 report 028 S 57 5 The listing label is attached to the appliance near the gas control valve A copy is shown to the right ICBO Appro...

Страница 3: ...nnection 16 Gas Inlet Pressure 16 Battery Pack Wireless Wall Switch Installation 17 Battery Installation 20 Remote Synchronization 21 Installation continued Vent Requirements 23 Approved Vent 23 Altit...

Страница 4: ...t and information on any installation restrictions or inspection requirements in your area If the flame becomes sooty dark orange in color or extremely tall do not operate the heater Call your dealer...

Страница 5: ...ing and maintenance instructions that you will need at a later time Always follow the instructions in this manual Do not touch the hot surfaces of the heater Educate all children of the danger of a hi...

Страница 6: ...ane Maximum BTU Input Per Hour 50 000 49 000 Minimum BTU Input on Low 28 500 26 900 Dimensions Weight 250 Lbs 1 Includes the required 2 clearance Includes the 1 standoff below the baseplate Does not i...

Страница 7: ...page 23 for part numbers Gas Line Equipment shutoff valve pipe etc 6 Needle Nose Pliers for removing the glass Installation Overview All requirements below must be met Non combustible facing see the s...

Страница 8: ...Place the cement board in place under the location where the fireplace is to be located 3 Place the fireplace in place making sure it is level and plumb Attach using the nailing brackets 4 Install th...

Страница 9: ...e building at a minimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in...

Страница 10: ...WARNING Failure to correctly erect the stand offs may lead to a serious fire hazard and will void the listing and warranty of this fireplace Side Stand Offs Bend the side stand off until it is flat Re...

Страница 11: ...0 Header Stand Off Rotate the header standoff until the side braces lock into place Rotate the header bracket up The notch in the side brace slides over this screw a b c d Un fold the side of the head...

Страница 12: ...alled walls in front of the fireplace must be a minimum 10 1 4 from the glass frame 4 1 4 from the side stand offs see Figure 3 Due to the high temperature the heater should be located out of traffic...

Страница 13: ...must be left clear to provide adequate clearance for the vent A maximum 3 1 2 depth is allowed in this 14 wide area centered along the front of the fireplace 14 Min 50 3 5 Max 56 75 25 Minimum 82 Fire...

Страница 14: ...5 installation uses the framing dimensions shown in the illustration below NOTE all clearances still apply A A A A A A A A A A A A A A A A A A A A A A 54 5 approximate AAAAAAAAAAA AAAAAAAAAAA AA AA AA...

Страница 15: ...ies 4060623 100 01170 Nailing Brackets AAAAAAAAAAAAA AAAAAAAAAAAAA AAAAAAAAAAAAA AAAAAAAAAAAAA AAAAAAAAAAAAA AAAAAAAAAAAAA AAAAAAAAAAAAA AAAAAAAAAAAAA Use screws or nails to secure the fireplace to th...

Страница 16: ...under 1 2 psig isolate the gas supply piping by closing the manual shutoff valve Leak test all gas line joints and the gas control valve prior to and after starting the fireplace Fuel This fireplace i...

Страница 17: ...similar grounding method Staple the two wires near the junction box This prevents the wires from slipping out of the junction box while the batteries are replaced Take care to prevent damage to wires...

Страница 18: ...e DCMD wires red and red black to the two wires red and black exiting the motor assembly on the gas control valve see Figure 12 item c P R E S S T O O P E N P O W E R A U X L e a r n C ontinuous Pilot...

Страница 19: ...e fourth lowest slot The DCMD wires are secured to the terminal block with these screws Connect the battery box wiring harness to this connector Back of Battery Box Battery Box Wiring Harness DCMD Wir...

Страница 20: ...s fireplace requires batteries for the remote wireless wall switch and battery box We recommend the batteies be replaced every year to insure proper operation Follow the directions below to install CR...

Страница 21: ...te and wall switch must have batteries to complete this process a b c d Press the ON button on the remote ON H L OFF Continuous Pilot MODE SET TEMP F ON OFF HI LO Shut the gas off to the appliance The...

Страница 22: ...Beep The receiver will acknowledge the signal by beeping 5 times Press the Learn button on the receiver module until it beeps once you may wish to use a pen or other device to depress this button P O...

Страница 23: ...6 98900024 12 Length 68GSS 12 98900023 24 Length 68GSS 24 98900022 36 Length 68GSS 36 98900021 48 Length 68GSS 48 98900020 2 to 12 Adjustable Length Slip Connector 68GSS 12A 98900025 45 Elbow 68GSS L4...

Страница 24: ...Sections 4 Clearance Above 2 Clearance To The Side 2 Clearance Below Vent Installation Slide the vent sections together and turn 1 4 turn until the sections lock in place Screws are not required to s...

Страница 25: ...In this example the restrictor is set in position 2 Tighten the screws once the restrictor is in the correct position open stock position 1 2 closed 3 Back Wall of Firebox Firebox Roof Figure 17 Inta...

Страница 26: ...AAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA 5 feet...

Страница 27: ...AAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAA 5 feet 0 feet 0 feet...

Страница 28: ...AAAAAAAAAAAAAAA AAAAAAAAAAAAAAA AAAAAAAAAAAAAAA AAAAAAAAAAAAAAA AAAAAAAAAAAAAAA AAAAAAAAAAAAAAA AAAAAAAAAAAAAAA AAAAAAAAAAAAAAA AAAAAAAAAAAAAAA AAAAAAAAAAAAAAA AAAAAAAAAAAAAAA AAAAAAAAAAAAAAA AAAAAAA...

Страница 29: ...AA AAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAA...

Страница 30: ...eneath the floor NOTE Clearance in accordance with local installation codes and the requirements of the gas supplier G Minimum 48 clearance from any adjacent building H Minimum 84 clearance above any...

Страница 31: ...AAAAAA AAAAAAAAAAAAA AAAAAAAAAAAAA AAAAAAAAAAAAA AAAAAAAAAAAAA AAAAAAAAAAAAA AAAAAAAAAAAAA AAAAAAAAAAAAA Min 10 Min 49 5 Min 0 5 Max 1 Non Combustible Hearth AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AA...

Страница 32: ...AAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAA AAAAAA AAAAAA AAAA AAAA AAAA AAAA A A A AA AA AA WARNING We recommend a hearth to protect the flooring surface from discoloration o...

Страница 33: ...lace WARNING Do not use adhesive to secure the cement board or facing The high temperatures of the fireplace may cause adhesives to emit odors Use mastic or thin set or other non combustible non odoro...

Страница 34: ...nces Non combustible facing on the front of the fireplace must extend a minimum 6 to each side of the glass frame Beyond 6 combustibles may be used but may not protrude more than 3 4 from the non comb...

Страница 35: ...A AAAA AAAA AAAA AAAA AAAA AAAA AAAA AAAA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AAAAAAA AAAAAAA Fireplace Drywall Framing AAAAA AAAAA Cement Board AAAAAA...

Страница 36: ...um mantel depth is 12 measured from the face Max 12 Base of the Fireplace Min 48 5 Mantel combustible or non combustible Combustible mantel columns legs that protrude more than 3 4 from the glass fram...

Страница 37: ...move the glass see page 39 NOTE If using propane LP convert the appliance prior to installing the logs see page 47 for details 2 We recommend you purge the gas line at this time with the glass removed...

Страница 38: ...cover plate see the illustration below After adjusting the air shutter replace the burner logs and glass and verify the flame quality Front Burner Air Shutter Rear Burner Air Shutter Air Shutter Cove...

Страница 39: ...gas to the fireplace This prevents any chance of accidental burner ignition when accessing the firebox Warning The appliance must be completely cool before removing the glass Warning Do not strike or...

Страница 40: ...nstall the firebacks following the directions below UP UP Herringbone Pattern Brick Pattern Remove the clip and screw located on the firebox ceiling near the front both sides b Right Floor Fireback Pl...

Страница 41: ...Industries 4060623 100 01170 Log Set Installation Overview Below is a picture detailing log placement for this fireplace Follow the directions on the following pages to place the logs correctly Cente...

Страница 42: ...42 Finalizing the Installation for qualified installers only Travis Industries 4060623 100 01170 Center Log Place the center log as shown below The rear log contacts the side and back fireback...

Страница 43: ...g Place the left lower log as shown below Right Rear Log Place the right rear log as shown below The left lower log rests in front of the burner holes and obscures the pilot The right rear log has a h...

Страница 44: ...ied installers only Travis Industries 4060623 100 01170 Upper Left Log Place the upper left log as shown below The upper left log has a notch that fits over the grate The upper left log has a hole tha...

Страница 45: ...is Industries 4060623 100 01170 Upper Right Log Place the upper right log as shown below The right rear log has a flat portion that the upper right log rests against The upper right log has a notch th...

Страница 46: ...ner The rock wool must be pulled apart and made into a thin gauze prior to placing over the burner See the illustration below for details NOTE Propane LP units use a lighter amount of rock wool than n...

Страница 47: ...e to ensure proper gas use 1 Remove the glass see page 37 Remove the logs and coals if installed page 40 2 Remove the burner see the illustration below Remove the two screws holding the grate in place...

Страница 48: ...the two orifices Screw each LP orifice in so the orifice protrudes 15 16 indicating full insertion Look here for the orifice identification Apply thread sealant to the LP orifices prior to installatio...

Страница 49: ...od until it is fully secure NOTE The sliding portion of the pilot orifice may be positioned differently Instead of pulling it towards you you may push it away Either way when the hole appears near the...

Страница 50: ...er position when switched to LP Figure 36 7 Remove the NG rate screw and replace it with the LP rate screw included in the owner s pack see Figure 37 Take care to not damage the rubber o ring on the r...

Страница 51: ...Finalizing the Installation for qualified installers only 51 Travis Industries 4060623 100 01170...

Страница 52: ...oval and Installation 39 Hearth Requirements Recessed Hearth 32 Hearth Requirements 31 Horizontal Termination 1 90 Elbow 26 Horizontal Termination 3 90 Elbows 27 Installation Options 6 Installation Ov...

Отзывы: