
INTERNALLY ROUTED DROPPER POST AND 2X LEVER
2X LEVER INSTALLATION
2
3
Position hinged lever clamp on
bar and tighten with 3mm Allen
wrench to maximum 2Nm.
Insert end of cable noodle
with rotary ferrule into lever
until the cable noodle is
completely seated.
Insert cable originating at
dropper post through rotary
ferrule and into the lever.
1
4
Insert barrel nut into the
round floating center blade
of the lever. It is very
important that the barrel
nut is placed into the
curved portion of the
floating center blade.
NOTE: The barrel nut that
will be inserted into the
lever has a hole for the
cable to slide through and is
tightened using a 2mm and
3mm Allen wrench.
7
Push the lever 5-10 times to make sure
the cable housing is fully seated and to
check for play in the cable. NOTE: If
there is play in the lever/cable, loosen
barrel nut with 2mm and 3mm Allen
wrenches and pull cable tight a second
time. For micro adjustment, use the
rotary ferrule on the cable housing.
8
5
Insert cable originating at
dropper post through rotary
ferrule and into the lever.
6
Tighten the barrel nut with a
2mm Allen wrench on one
side and a 3mm Allen wrench
on the other side.
Slide cable into the guide under
the lever. Trim excess cable with
cable cutters leaving enough
room to install the cable end,
approximately 10mm. It is
important to use proper cable
cutters to prevent the cable from
fraying. Crimp cable end in place.