background image

Installation Instructions

800.882.9110  |  208.772.8515  |  www.SmithsPower.com

ALPU Lite

ALPU-L130

WALL MOUNT INSTALLATION INSTRUCTIONS

1.  Cable openings must be oriented towards the ground.

2.  Open lid of unit to access wall mount holes (see Figure 1).

3.  Use quantity 2 to 4 M3.5 (or #6) fasteners to secure to the desired surface.  If using 

only 2 fasteners, install per the following pairs (1,1), (2,2), or (3,3).  (See Figure 2 

for fastener configurations).

4.  Do not torque fasteners greater than 1 Nm (8.8 in-lbf) ±10%.

POLE MOUNT INSTALLATION 

INSTRUCTIONS

1.  Cable openings must be oriented 

towards the ground. 

2.  Slide hose clamp or tie wrap through 

two slots on back of unit (see Figure 3).  

3.  Align channel in unit with pole and 

secure with hose clamp.  Do not over-

tighten hose clamp as this may cause 

damage to plastic bars in hose clamp 
region of the unit.

Figure 1 - Wall mount installation

Figure 2 - Fastener configuration

1

1

2

2

3

3

Figure 3 - Pole mount installation

Figure 4 - Cable installation

ICON INFORMATION

1.  There are three icons visible when the unit is open (see Figure 5).  The icon 

located in center denotes orientation of the unit.

2.  The icon with the up arrow indicates unprotected signal entry, while the icon with 

down arrow indicates protected signal transmitted out.

Figure 5 - Icon information

CABLE INSTALLATION 

INSTRUCTIONS

WARNING! - Ground lug must 

be secured as indicated below to 

ensure proper product performance.

1.  Secure ground lug with M5 (#10) 

screw (provided as installed with 

unit).  Torque to 1 Nm (8.8 in-lbf) 

±10% (see Figure 4).

2.  Verify that each cable is aligned 

with the opening directly below its 

respective connection point when 

closing the lid.

3.  Lid should snap closed.

1402-042 Rev B

Отзывы: