P a g e
|
23
System
→
Reboot:
Click “Reboot”, it displays the screen as Figure-15 where to operate reboot when necessary.
Figure-15
CHAPTER 4
TROUBLESHOOTING
TRANSLITE’s ISO9001 quality assurance system has been approved by CQC organization. For
guarantee the products’ quality, reliability and stability. All TRANSLITE products have been
passed the testing and inspection before ship out factory. The testing and inspection scheme
already covers all the Optical, Electronic and Mechanical criteria which have been published by
TRANSLITE. To prevent potential hazard, please strictly follow the operation conditions.
Prevention
Measure
➢
Installing the device at the place in which environment temperature between 0 to 45 °C
➢
Making sure good ventilation for the heat-sink on the rear panel and other heat-sink bores if
necessary
➢
Checking the input AC within the power supply working range and the connection is correct
before switching on device
Содержание TL-2500 Series
Страница 6: ...P a g e 6 ...
Страница 25: ...P a g e 25 ...