Trane SRUB Скачать руководство пользователя страница 18

18

SRUB-IOM001-EN

Electrical Wiring

Trane Scroll Compressors

Because Trane scroll compressors are uniquely different

from traditional reciprocating compressors, their operating

characteristics and requirements represent a departure from

reciprocating compressor technology.

 WARNING 

: Avoid contact with the top of the

scroll compressor. It becomes hot during normal operation.

Compressor Electrical Phasing

Proper phasing of the electrical power wiring is critical for

proper operation and reliability of the scroll compressor.

Figure 4 illustrates correct supply power phasing for the scroll

compressor.

Proper rotation of the scroll compressor must be established

before the machine is started. This is accomplished by

confirming that the electrical phase sequence of the power

supply is correct. The motor is internally connected for

clockwise rotation with the inlet power supply phased A,B,C.

To confirm the correct phase sequence (ABC), use a Model

45 Associated Research Phase indicator or equivalent.

See Figure 5

Voltages generated in each phase of a polyphase alternator

or circuit are called phase voltages. In a three-phase circuit,

three sine wave voltages are generated, differing in phase

by 120 electrical degrees. The order in which the three

voltages of a three-phase system succeed one another is

called phase sequence or phase rotation. This is determined

by the direction of rotation of the alternator. When rotation is

clockwise,  phase sequence is usually called “ABC”, when

counterclockwise, “CBA”.

This direction may be reversed outside the alternator by

interchanging any two of the line wires. It is this possible

interchange of wiring that makes a phase sequence indicator

necessary if the operator is to quickly determine the phase

rotation of the motor.

Correcting Improper Electrical Phase Sequence

Proper compressor motor electrical phasing can be quickly

determined and corrected before starting the unit. Use a  quality

instrument such as an Associated Research Model 45 Phase

Sequence Indicator and follow this procedure.

1. Open the electrical disconnect or circuit protection switch

that provides line power to the line power terminal block in

the control panel (or to the unit-mounted disconnect).

2. Connect the phase sequence indicator leads to the 1TB as

follows:

Phase seq. Lead

1TB Terminal

Yellow (Phase A)............. L1

Blue

(Phase B)............. L2

Black

(Phase C).............L3

Refer to Figure 6

3. Read the phase sequence on the indicator after turning

power on by closing the unit supply power fused disconnect.

The “ABC” Indicator on the face of the phase indicator will

glow if phase is ABC.

 WARNING 

: To prevent injury or death due to

electrocution, take extreme care when performing service
procedures with electrical power energized.

Figure 4

Connect

To

 Contractor

Internal Motor

Wiring Diagram

External Motor

Wiring Diagram

T1 (Phase A)

T2 (Phase B)

T1

T2

T3

T3 (Phase C)

Содержание SRUB

Страница 1: ...Operation Maintenance Air Cooled Self Contained Air Conditioner 7 5 20 Tons SRUB Model 50Hz Jan 2002 SRUB IOM001 EN Single Compressor Dual Compressors SRUB 080 SRUB 160 SRUB 110 SRUB 190 SRUB 130 SRUB...

Страница 2: ...ervice Digit Minor Design Sequence Factory Installed Options 01 Arrangement 1 02 Arrangement 2 03 Arrangement 3 04 Arrangement 4 Electrical Characteristics D 380 415 3 50 Compressor A Single Compresso...

Страница 3: ...plication Considerations 5 Outline For Installation 6 General Information 8 Installation 9 Unit Installation 10 Installation Checklist 11 Refrigerant Charging and Evacuation 12 Electrical Wiring 14 El...

Страница 4: ...Ft 9 06 12 5 12 5 17 22 17 22 20 14 20 14 No of Refrigeration Circuit 1 1 1 2 2 2 2 COMPRESSOR RLA LRA 16 4 95 0 19 2 125 0 19 6 125 0 16 4 95 0 16 4 95 0 19 2 125 0 19 6 125 0 19 2 125 0 Internal Ove...

Страница 5: ...PLENUM USING EQUIPMENT ROOM ARRANGEMENT 4 ARRANGEMENT 3 SUPPLY AIR SUPPLY AIR SUPPLY AIR SUPPLY AIR SUPPLY AIR SUPPLY AIR FRESH AIR IN CONDENSER AIR OUT CONDENSER AIR IN SUPPLY AIR RETURN AIR UNIT LOC...

Страница 6: ...D E D 1 2 H J I 2 5 16 1 1 2 9 16 7 13 16 5 10 5 16 12 13 16 4 1 8 3 4 KNOCKOUT FOR CONTROL WIRING BOTH ENDS 1 1 4 KNOCKOUT FOR UNIT POWER BOTH ENDS 3 4 F P T CONDENSATE DRAIN CONN THIS END F PILOT RE...

Страница 7: ...nch A D E D F F J I H 4 1 8 5 7 13 16 10 5 16 12 13 16 2 5 16 1 1 2 9 16 3 4 F P T CONDENSATE DRAIN CONN THIS END 3 4 KNOCKOUT FOR CONTROL WIRING BOTH ENDS 1 1 4 KNOCKOUT FOR UNIT POWER BOTH ENDS PILO...

Страница 8: ...and maintenance accessibility and an improved accessory line They are of the vertical or horizontal discharge with the vertical standard Note Warnings and Cautions appear at appropriate places in this...

Страница 9: ...the unit cabinet or damaging the unit finish Figure 1 Space Requirement for SRUB Model Table 1 Show Space Requirement for SRUB Model Inspection Checklist To protect against loss due to damage incurre...

Страница 10: ...tioner 2 Allow minimum recommended clearances for maintenance and routine service Refer to Service Data See in figure 1 3 Available power supply must agree with electrical data on component nameplate...

Страница 11: ...ion of drain pan outlet Unit properly mounted on isolators if used Compressor and supply fan properly isolated Unit protective shipping covers removed Component Overview Fan and motor shafts are paral...

Страница 12: ...ready to operate Procedure 1 Open liquid valve that refrigerant go through system and open suction valve 2 Turn on power to the unit Allow the system to run for five to ten minutes to stabilize operat...

Страница 13: ...t charge has entered the system At this point close the liquid line charging valve and the refrigerant cylinder 5 Allow the system to continue to operate frequently checking the liquid line sight glas...

Страница 14: ...14 SRUB IOM001 EN Electrical Wiring...

Страница 15: ...SRUB IOM001 EN 15 Electrical Wiring...

Страница 16: ...16 SRUB IOM001 EN Electrical Wiring...

Страница 17: ...SRUB IOM001 EN 17 Electrical Wiring...

Страница 18: ...nce or phase rotation This is determined by the direction of rotation of the alternator When rotation is clockwise phase sequence is usually called ABC when counterclockwise CBA This direction may be...

Страница 19: ...on Compressor cannot compress the refrigerant Pressure will not increase at high pressure side Compressor will operate loudly The current Amps will be lower Switch two line leads on 1TB and check agai...

Страница 20: ...pressor motors Voltage Imbalance Excessive voltage imbalance between phases in a three phase system will cause motors to overheat and eventually fail Maximum allowable imbalance is 2 percent Voltage i...

Страница 21: ...ion 3 Turn the rotary switch of the thermostat field supplied to cool position Operation Unit is operated by positioning the fan switch at cool Please ensure there are at least a minimum of 50 design...

Страница 22: ...spect clean and tighten all electrical connections Inspect the TXV sensing bulbs for cleanliness good contact with suction line and insulated from ambient Check superheat setting of TXV It should be 1...

Страница 23: ...Check the fan motor sheave alignment with a straightedge or a tightly pulled string For sheaves of different widths place a string in the center groove of each sheave and pull it tight for a center l...

Страница 24: ...ling demand or when dirty conditions prevail A routine cleaning schedule minimum of once per year is recommended to prevent dirt buildup in the coil fins where it may not be visible Remove large debri...

Страница 25: ...SRUB IOM001 EN 25 Note...

Страница 26: ...26 SRUB IOM001 EN Note...

Страница 27: ...oad Samrong Tai Samutprakarn 10130 http www trane com An American Standard Company Literature Order Number SRUB IOM001 EN New Stocking Location Bangkok Thailand 35 8 10130 Since The Trane Company has...

Отзывы: