Trane Precedent FIAEHTB309 Series Скачать руководство пользователя страница 8

Installation

8

 ACC-SVN228B-EN

8. Secure the electric heater element assembly with the 

necessary amount of screws.

9. Slide the electric heater control panel/access door 

assembly inward until the rear edge engages with retaining 
clips. Se

Figure 2

. Secure the control panel with screws 

at the top against the vestibule panel and against the 
indoor divider panel. See 

Figure 5

.

10. To install the hinged door stops, loosen one existing screw 

from the upper left side of the electric heater compartment 
opening. Position each door stop with outer tab flush 
against center post and secure each door stop with one or 
two screws. 

11. Wire control voltage to indoor options module using the 

suppled harness. Route wires from heater assembly to 
indoor options module in main control box. Refer to 

Figure 19

 for indoor option module location. Stage 1 to J6 

and stage 2 (if installed) to J7. Refer to included schematic 
and main unit sheet 5 for remaining balance of circuit.

12. After heater is installed and before applying power, verify 

the following: 
a. Heating elements are not damaged or pinched.
b. Heating elements are not short circuited to each other 

or to the heater frame or equipment cabinet. 
Test every heater element with ohmmeter and verify 
heater element terminals are electrically isolated from 
cabinet and ground (infinite resistance). On downflow 
units with or without duct work installed or horizontal 
units without ductwork installed, remove horizontal 
supply cover and carefully inspect elements after 

Figure 4. Electric heater assembly

Figure 5. Electric heater control panel/access door 

assembly

Figure 6. Hinged door stops

NOTICE

Use Copper Conductors Only! 

Failure to use copper conductors could result in 

equipment damage as the equipment was not designed 

or qualified to accept other types of conductors. 

WARNING

Proper Field Wiring and Grounding 

Required!

Failure to follow code could result in death or serious 

injury. 

All field wiring MUST be performed by qualified 

personnel. Improperly installed and grounded field 

wiring poses FIRE and ELECTROCUTION hazards. To 

avoid these hazards, you MUST follow requirements for 

field wiring installation and grounding as described in 

NEC and your local/state/national electrical codes. 

Magnets

Hinged panel

Содержание Precedent FIAEHTB309 Series

Страница 1: ...fic knowledge and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in...

Страница 2: ...dous situation which if not avoided could result in minor or moderate injury It could also be used to alert against unsafe practices NOTICE Indicates a situation that could result in equipment or prop...

Страница 3: ...r respective owners Revision History Updated Table 2 in the General information chapter Added FIADAST008 requirements with heat pump models in the Installation chapter WARNING Follow EHS Policies Fail...

Страница 4: ...28B EN Table of Contents General Information 5 Installation 7 Precedent 6 to 12 5 Tons 7 Inspection 7 Precedent 15 to 25 Tons Cooling Only and 12 5 to 25 Tons Heat Pump 10 Inspection 10 Temperature Ri...

Страница 5: ...327 FIAEHTB336 FIAEHTB354 FIAEHTC318 T J150 3 FIAEHTC327 FIAEHTC336 FIAEHTC354 FIAEHTB409 T J072 4 T J090 4 T J102 4 FIAEHTB418 T J120 4 FIAEHTB427 FIAEHTB436 FIAEHTB454 FIAEHTC418 T J150 4 FIAEHTC427...

Страница 6: ...IAEHTD436 T J210 4 T J240 4 T J300 4 FIAEHTD454 FIAEHTD472 FIAEHTDW18 T J180 W FIAEHTDW36 T J210 W T J240 W T J300 W FIAEHTDW54 FIAEHTDW72 FIAEHWD318 W G J150 3 W G J180 3 FIAEHWD336 W G J240 3 W G J3...

Страница 7: ...upport the electric heat assembly and secure the inward edge of the electric heat accessory control panel Slits in the insulation should allow the tabs to protrude through the insulation and be visibl...

Страница 8: ...ollowing a Heating elements are not damaged or pinched b Heating elements are not short circuited to each other or to the heater frame or equipment cabinet Test every heater element with ohmmeter and...

Страница 9: ...r equipment has been in operation and components have reached operating temperature 13 Install the magnets into the door The magnets should lock into place once installed 14 Close electric heater cont...

Страница 10: ...9 below WARNING Hazardous Voltage w Capacitors Failure to disconnect power and discharge capacitors before servicing could result in death or serious injury Disconnect all electric power including re...

Страница 11: ...oute the Heater 2 wires through the bushing and run the wires to Heater 2 Heater 2 wires are labeled 2A or 2B iii Install the other plastic ring bushing in the wire chase hole so it is installed from...

Страница 12: ...unit by tipping the back of the assembly up slightly and engaging the heater side brackets between the guide rails Verify the free end of the wire harness is away from the heater opening as the assem...

Страница 13: ...ain control box a Refer to Figure 19 for indoor option module location Wire control voltage harnesses from contactors to indoor options module Stage 1 to J6 and Stage 2 if installed to J7 b Refer to s...

Страница 14: ...m 9 00 1 15 81 12 64 11 16 18 00 1 31 61 25 29 22 31 18 97 15 17 12 64 27 00 2 47 42 37 93 33 47 28 45 22 76 36 00 2 63 22 50 58 44 63 37 93 30 35 25 28 21 67 18 96 15 17 54 00 2 56 90 45 52 37 93 32...

Страница 15: ...Notes ACC SVN228B EN 15...

Страница 16: ...ations without notice We are committed to using environmentally conscious print practices Trane and American Standard create comfortable energy efficient indoor environments for commercial and residen...

Отзывы: