10
Installation
Pre-Installation
General installation checks
If the content of the machine's name plate is the same as that of the order.
• If there is any damage or material shortage during transportation of the unit; if yes, please notify the
deliverer timely.
Installation position
• If there is adequate ventilation available at the installation position.
• If drainage facilities are installed for handling the seeper at the pedestal.
• Unpack the water chill er and dispose the packing materials (such as paperboard, prospective film
and etc.).
• If there are enough repair passages available.
• Fit springs or rubber shockproof gaskets.
• Fix the unit in its installation position.
• Adjust the levelness of the water chiller.
Adoption of the following water chiller fixing methods can minimize the noise of the water chiller:
• Install the unit on an independent concrete foundation.
• Fit spring or rubber shockproof gasket at each fixing foot.
For overall dimension of the water chiller and the dimension of the foundation, please refer to
Figure 2. For recommended minimum maintenance space, please refer to Figure 3.
40
30
640
74
0
450
496
2330
640
150
640
40
30
1630
450
730
1630
850
496
640
74
0
40
30
640
74
0
450
496
2330
640
150
640
40
30
1630
450
730
1630
850
496
640
74
0
640
950
402
393
CGAR(K)0606R/1005R
CGAR(K)0305R/0306R/0505R/0605R/0755R
CGAR(K)1205R/1505R/2005R
Figure 2. Installation dimensions
Содержание Koolman R410A
Страница 32: ...32 PKGP SVX03D EN Controller Wired controller ...