186
RT-SVX24Q-EN
Trane Startup Checklist
This checklist is intended to be a guide for the Trane
technician just prior to unit 'startup'. Many of the
recommended checks and actions could expose the
technician to electrical and mechanical hazards. Refer
to the appropriate sections in the this manual for
appropriate procedures, component specifications and
safety instructions.
IIm
mp
po
orrtta
an
ntt:: This checklist is not intended as a
substitution for the contractor’s installation
instruction.
IIm
mp
po
orrtta
an
ntt:: Except where noted, it is implied that the
Trane technician is to use this checklist for
inspection/verification of prior tasks
completed by the general contractor at
installation. Use the line item content to
also record the associated values onto the
Trane unitary packaged equipment log.
J
Jo
ob
b N
Na
am
me
e
S
Se
erriia
all #
#
J
Jo
ob
b L
Lo
occa
attiio
on
n
M
Mo
od
de
ell #
#
S
Sa
alle
ess O
Orrd
de
err #
#
S
Sh
hiip
p D
Da
atte
e
U
Un
niitt D
DL
L #
# ((ssp
pe
ecciia
all u
un
niittss))
D
Da
atte
e
S
Stta
arrttiin
ng
g S
Sa
alle
ess O
Offffiicce
e
T
Te
ecch
hn
niicciia
an
n
Table 64.
Startup checklist for S*HJ, 90–162 units
Complete
1
Crankcase heaters working for 8 hours prior to arrival of Trane technician performing startup
Yes
No
2
Correct voltage supplied to unit and electric heaters
3
Unit exterior inspected
4
Disconnect all power, Unit interior free from debris/obstructions etc.
5
Open all access doors to verify all open and close fully without any binding
6
All wiring connections tight
7
Unit properly grounded
8
Copper power wiring meets sizing requirement
9
All field control wiring for CV, SZVAV or VAV controls completed
10
All automation and remote controls installed/wired
11
Unit clearances adequate for service and to avoid air recirculation etc.
12
All unit drain lines and traps proper
13
All coil fins inspected and straightened
14
Shipping hardware for compressors removed
15
Hold down bolts and channels from fan sections removed
16
Fan section spring isolators checked/adjusted
17
Damper linkages tight/adjusted
18
Rail connector splice brackets installed on low side base rail
Where applicable: Evaporative condenser
19
Verify incoming water pressure is between 35-60psig, dynamic pressure (measured with valve open) for min flow
rate of 30 GPM
20
Verify fan shipping brackets between fans and mist eliminators above spray distribution system have been
removed
21
Verify water treatment system has been installed and approved - discontinue start-up if proof of active water
treatment does not exist
22
Verify conductivity controller calibration has been documented
23
Verify conductivity controller min and max setpoints have been setup
24
Verify all water and drain connections are complete
25
Verify the sump fills to within 1" of the overflow
26
Verify drain valve is set to "drain during power loss" or "hold during power loss" per job specification
Where applicable: Electric Heat
27
Electric heat circuits have continuity
Where applicable: Gas Heat
28
Gas heat piping includes drip leg previously installed by controlling contractor
29
Gas heat flue assembly fully installed
30
Gas heat condensate line + heat tape installed where applicable
Содержание IntelliPak 2 Series
Страница 217: ...RT SVX24Q EN 217 N No ot te es s...
Страница 218: ...218 RT SVX24Q EN N No ot te es s...
Страница 219: ...RT SVX24Q EN 219 N No ot te es s...