
RT-SVX072A-EN
63
Main Electrical Power
Lock and tag out unit main electric power and remove
power supply wiring from installed disconnect/terminal
block of unit. See for locations.
N
No
otte
e:: Inspect wiring to ensure that all field-installed
wiring complies with NEC and applicable local
codes.
SEHF Units with 200V or 230V Electric
Heat
(Requires separate power supply to heater)
Lock and tag out unit main electric power and remove
power supply wiring for the electric heat from a
dedicated, field- supplied/installed disconnect to
terminal block, or to an optional unit-mounted
disconnect switch. See for locations.
Field-installed Control Wiring
N
No
otte
e:: Inspect wiring to ensure that all field-installed
wiring complies with NEC and applicable local
codes.
Remove the field wiring connections for the variable air
volume controls as applicable.
N
No
otte
e:: Label wiring to save time when reconnecting
wiring is necessary.
Remove ground wire from the unit.
N
No
otte
e:: The electrical connection for 40, 60, 70 and 75 ton
is 32 inches further down the unit than older
(pre-2010) style units. On full perimeter curbs,
this also means the incoming electrical will be
outside the curb area. The electrician should be
informed of both points.
See for typical field wiring for 20-75 ton units. See
for typical field power wiring for 90-130
ton units.
Requirements for Gas Heat
W
WA
AR
RN
NIIN
NG
G
H
Ha
azza
arrd
do
ou
uss G
Ga
asse
ess a
an
nd
d F
Flla
am
mm
ma
ab
blle
e
V
Va
ap
po
orrss!!
F
Fa
aiillu
urre
e tto
o o
ob
bsse
errv
ve
e tth
he
e ffo
ollllo
ow
wiin
ng
g iin
nssttrru
uccttiio
on
nss cco
ou
ulld
d
rre
essu
ulltt iin
n e
ex
xp
po
ossu
urre
e tto
o h
ha
azza
arrd
do
ou
uss g
ga
asse
ess,, ffu
ue
ell
ssu
ub
bsstta
an
ncce
ess,, o
orr ssu
ub
bsstta
an
ncce
ess ffrro
om
m iin
ncco
om
mp
plle
ette
e
cco
om
mb
bu
ussttiio
on
n,, w
wh
hiicch
h cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss
iin
njju
urry
y.. T
Th
he
e sstta
atte
e o
off C
Ca
alliiffo
orrn
niia
a h
ha
ass d
de
ette
errm
miin
ne
ed
d tth
ha
att
tth
he
esse
e ssu
ub
bsstta
an
ncce
ess m
ma
ay
y cca
au
usse
e cca
an
ncce
err,, b
biirrtth
h d
de
effe
eccttss,,
o
orr o
otth
he
err rre
ep
prro
od
du
uccttiiv
ve
e h
ha
arrm
m..
IIm
mp
prro
op
pe
err iin
nsstta
alllla
attiio
on
n,, a
ad
djju
ussttm
me
en
ntt,, a
alltte
erra
attiio
on
n,,
sse
errv
viicce
e o
orr u
usse
e o
off tth
hiiss p
prro
od
du
ucctt cco
ou
ulld
d cca
au
usse
e
fflla
am
mm
ma
ab
blle
e m
miix
xttu
urre
ess o
orr lle
ea
ad
d tto
o e
ex
xcce
essssiiv
ve
e cca
arrb
bo
on
n
m
mo
on
no
ox
xiid
de
e.. T
To
o a
av
vo
oiid
d h
ha
azza
arrd
do
ou
uss g
ga
asse
ess a
an
nd
d
fflla
am
mm
ma
ab
blle
e v
va
ap
po
orrss ffo
ollllo
ow
w p
prro
op
pe
err iin
nsstta
alllla
attiio
on
n a
an
nd
d
sse
ettu
up
p o
off tth
hiiss p
prro
od
du
ucctt a
an
nd
d a
allll w
wa
arrn
niin
ng
gss a
ass p
prro
ov
viid
de
ed
d
iin
n tth
hiiss m
ma
an
nu
ua
all..
1. Remove and isolate gas supply from the unit gas
train.
2. Ensure gas supply line piping joints are properly
sealed.
3. Remove drip leg Installed in the gas piping near the
unit.
4. Remove factory-supplied flue assembly installed on
the unit.
5. Remove the 3/4" CPVC furnace drain stub out that
was used for condensate drain.
Requirements for Hot Water Heat (SLH*)
1. Remove and isolate water piping that comes into
the heating section from the base of the unit.
2. Remove the installed, 3-way modulating valve, if
necessary, to remove unit.
3. Remove the valve actuator wiring.
Requirements for Steam Heat (SSH*)
1. Remove and isolate steam piping that comes into
the heating section from the base of the unit.
2. Remove, 2-way modulating valve if necessary.
3. Remove the valve actuator wiring.
Space Pressure Sensor and Tubing
Installation
(All units with Statitrac)
Remove field-supplied pneumatic tubing connected to
the space pressure transducer located in the filter
section (see
).
Figure 33.
Duct static pressure control layout
SPACE PRESSURE TRANSDUCER
& SOLENOID ASSEMBLY
DUCT STATIC
TRANSDUCER ASSEMBLY
OUTSIDE AIR REFERENCE
TUBE CONNECTS HERE
RETURN AIR TRANSDUCER
& SOLENOID ASSEMBLY
TRAQ TRANSDUCER
& SOLENOID ASSEMBLY
Содержание IntelliPak 1
Страница 134: ...134 RT SVX072A EN Figure 108 Dry bulb changeover map T Tr ra an ne e S St ta ar rt tu up p C Ch he ec ck kl li is st t ...
Страница 161: ...RT SVX072A EN 161 N No ot te es s ...
Страница 162: ...162 RT SVX072A EN N No ot te es s ...
Страница 163: ...RT SVX072A EN 163 N No ot te es s ...