Pre-Start Check List
Task
Initial
Date
1. Voltage is present and landed at equipment.
2. Gas piping is complete and landed at each component. Inlet gas pressure
to be between 7 in. wg and 14 in. wg.
3. Field installed sensors installed. Refer to
“Factory-Provided Sensors,” p. 54
for list of sensors that may be required.
4. Control wiring installed and landed.
5. Accessories installed.
6. Ductwork installed (all runs in place, final tie in complete).
7. Drain lines installed and properly terminated.
8. Startup appointment with Horizon certified Trane service technician set and
confirmed.
Notes:
•
Check list must be completed and returned to Trane before startup is scheduled.
•
Startup must be performed by a Horizon-certified Trane technician with Tracer™ TU program.
•
Contractor to furnish access to equipment (ladder, lift, or roof access).
Содержание Horizon OABE/F
Страница 32: ...Unit Clearances Curb Dimensions and Dimensional Data 32 OAU SVX004D EN ...
Страница 37: ...Unit Weight and Rigging OAU SVX004D EN 37 ...
Страница 55: ...Installation OAU SVX004D EN 55 ...
Страница 78: ...Performance Data 78 OAU SVX004D EN ...
Страница 84: ...Appendix 84 OAU SVX004D EN Figure 79 BAYSENS036A installation instructions ...
Страница 85: ...Appendix OAU SVX004D EN 85 Figure 80 VELCON 0351 installation instructions ...
Страница 89: ...Appendix OAU SVX004D EN 89 ...
Страница 90: ......
Страница 91: ......