![Trane Gas Heat Sections
for Performance Climate Changer Air Handlers Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/trane/gas-heat-sections-for-performance-climate-changer-air-handlers/gas-heat-sections-for-performance-climate-changer-air-handlers_installation-operation-and-maintenance-manual_1149988014.webp)
14
CLCH-SVX08A-EN
Installation
Service Clearance Recommendations
A minimum clearance of the section width plus 12 inches on the access door side of the gas heat
section is recommended for routine maintenance. This clearance provides enough room to replace
the heat exchanger in the event of failure. The section side panels must be removed to access the
heat exchanger. Refer to
Figure 4
for service clearance recommendations for the air handler.
Figure 4.
Service Clearance
Filter mixing box
Coil
Fan
Gas heat
Access
door
UV
lights
VFD
F
E
D
C
B
A
Table 5.
Service clearances (inches)
Component
3
4
6
8
10
12
14
17
21
25
30
35
40
50
57
66
80
100 120
A (filter)
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
52
56
58
58
B (coil)
48
59
59
66
77
82
87
87
95
95
109
115
128
141
141
156
156
170
197
C (UV Lights)
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
52
56
58
58
D (external
starter or VFD)
61
61
61
61
61
61
61
61
64
64
64
64
64
64
64
64
64
64
64
D (internal
starter or VFD)
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
E (fan)
48
48
48
48
51
54
58
61
60
66
66
66
70
77
77
93
93
101
101
F (gas heat -
Ext Vestibule)
N/A
N/A
89
90
108
100
100
105
115
115
118
136
140
156
156
170
179
180
N/A
F (gas heat -
Int Vestibule)
N/A
N/A
56
63
74
79
84
84
92
92
106
112
125
138
138
153
153
167
194
Note:
At a minimum, the above clearance dimensions are recommended on one side of the unit for regular service and maintenance. Refer to as-built
submittal for locations of items such as filter access doors, coil, piping connections, motor locations, etc. Sufficient clearance must be provided on
all sides of unit for removal of access panels, plug panels, or section-to-section attachment brackets. Clearance for starters, VFDs, or other high-voltage
devices must be provided per NEC requirements.
Содержание Gas Heat Sections for Performance Climate Changer Air Handlers
Страница 23: ...CLCH SVX08A EN 23 Wiring Figure 13 200 1000 MBh 3 1 or 10 1 turndown wiring diagram ...
Страница 24: ...24 CLCH SVX08A EN Wiring Figure 14 1250 2000 MBh 3 1 or 10 1 turndown wiring diagram ...
Страница 25: ...CLCH SVX08A EN 25 Wiring Figure 15 1250 2400 MBh 20 1 turndown wiring diagram ...
Страница 35: ...CLCH SVX08A EN 35 Notes ...