Introduction
CLCH-SVX014B-EN
3
Copyright
This document and the information in it are the property of
Trane, and may not be used or reproduced in whole or in
part without written permission. Trane reserves the right
to revise this publication at any time, and to make changes
to its content without obligation to notify any person of
such revision or change.
Trademarks
All trademarks referenced in this document are the
trademarks of their respective owners.
Revision History
•
Updated start-up procedure.
•
Updated normal sequence of operation.
•
Added new chapter Troubleshooting Guide.
WARNING
Follow EHS Policies!
Failure to follow instructions below could result in
death or serious injury.
•
All Ingersoll Rand personnel must follow Ingersoll
Rand Environmental, Health and Safety (EHS)
policies when performing work such as hot work,
electrical, fall protection, lockout/tagout, refrigerant
handling, etc. All policies can be found on the
BOS
site
. Where local regulations are more stringent than
these policies, those regulations supersede these
policies.
•
Non-Ingersoll Rand personnel should always follow
local regulations.
Содержание CSA004
Страница 24: ...24 CLCH SVX014B EN Wiring Diagrams Figure 12 Typical wiring diagram for 5 1 turndown heater ...
Страница 25: ...Wiring Diagrams CLCH SVX014B EN 25 Figure 13 Typical wiring diagram for 10 1 turndown heater ...
Страница 26: ...Wiring Diagrams 26 CLCH SVX014B EN Figure 14 Typical wiring diagram for 20 1 turndown heater ...