
Electrical Wiring
30
CG-SVX038A-EN
communication via BACnet
®
MSTP, Johnson N2, and
L
ON
W
ORKS®
, and this should be ordered with the chiller if
required. An ethernet connection is also provided on each
unit. While field changes can be made, please insure that
the unit is ordered set up for required communications to
insure that factory testing includes end user configuration.
A complete software support package is available for your
PC allowing for system configuration, dynamic on-line
display screens, remote communication, graphing and
more. See
“Downloading and Installing Unit Controller
(MCS-Connect) Software,” p. 31
for download
instructions. All information needed to run the unit is
available from the unit display; however, a laptop
computer is invaluable for ease of use of diagnosing or
changing the unit setpoints.
Note:
Not all setpoints can be changed with
MCS-Connect; some require a configuration
change.
A serial cable is included in each shipment for the
convenience of the field tech. If you do not have a laptop
with a serial port, you will require a converter such as a
Black Box item number #IC199A-R3 serial-to-USB adaptor.
The standard configuration allows for unit to start at
lowest stage possible, then add compressors as needed to
meet demand.
Important:
All configuration changes need to be done
by factory representatives to ensure proper
operation of the unit within design
parameters. Refer to MCS unit controller
manual for sequence of operation and
additional details.
Содержание Cold Generator
Страница 67: ......